Good evening, everyone, and welcome to the Monterey Park City Council Chambers.
TL;DR
- Council called to order and flag salute0:00
- City Manager Ron Bow presented fiscal overview and ARPA allocations2:01
- Council received and filed preliminary budget documentation8:31
- Discussion of Good Views slope mitigation project and reserve impact35:55
- City Manager explained internal service fund methodology35:55
- Council discussed ARPA funding for recreation and library programs60:01
- Council reviewed capital improvement projects and street bond usage18:46
- Barnes Park Pool restoration discussion and agreement to pursue plan19:02
- Public Works outlined street resurfacing schedule and back‑alley inventory20:02
- Council agreed to continue economic recovery task‑force meetings99:32
- Council concluded with plan to file full budget for adoption at next meeting226:01
Summary
The special meeting on May 25, 2022 focused almost entirely on the Fiscal Year 2022‑23 budget. City Manager Ron Bow presented a comprehensive overview of revenue projections, staffing plans, ARPA allocations, and capital improvement projects, with detailed departmental summaries from the Clerk, Treasurer, Attorney, Management Services, Human Resources, and Public Works. Council members asked clarifying questions about internal service fund methodology, reserve depletion from the Good Views slope mitigation project, and the allocation of ARPA funds to recreation and library programs. The council received and filed the preliminary budget documentation at (8:31 · minutes), and subsequently agreed to pursue restoration of Barnes Park Pool, street resurfacing under the bond, and continued economic‑recovery task‑force meetings at (19:02 · mixed). No formal motions or votes were taken during the meeting; all substantive items remained under discussion and action item assignment.
Key policy discussions included the Good Views project’s $17 M cost and its impact on reserves, the allocation of ARPA funds to new staff and equipment across departments, and the use of the street bond exclusively for resurfacing. The council also reviewed capital projects such as pipe relining, water main replacements, and smart‑meter replacement programs. The meeting concluded with a plan to file the full budget for adoption at the next regular council meeting.
Overall, the council’s primary outcome was to approve the preliminary budget and set a series of follow‑up actions to refine departmental budgets, address infrastructure maintenance, and continue economic recovery efforts.99:32
Transcript
! Today is Wednesday, May 25, 2022.
! It is now 6.30 p.m.
! The City Council of Monterey Park City Council
! The City Council of Monterey Park City Council ! The City Council of Monterey Park City Council !
meeting is called to order. If I could ask you all to please stand for the flag salute.
Please place your right hand over your heart and repeat after me.
I pledge allegiance to the flag of the United States of America and to the republic for which it stands, one one nation, under God, indivisible, with liberty and justice for all.
Thank you. Please be seated. Mr. Thurk, can you do the roll call, please? Thank you. Council Member Yvonne Yu? Here. Council Member Peter Chan? Here. Council Member Hans-Liang? Here. Mayor Henry Lo? Okay.
Thank you. Mayor Lo had contacted us. You may be wondering why the gavel is over here. He called, and he is going to be a little bit late. While we have the meeting scheduled for 630, it's our policy that we start on time. So I will, as you have seen, open the meeting tonight. I will be chairing until our mayor arrives, at which time I will pass the gavel back to him. So do we have any additions, agenda additions, deletions, changes, and adoptions?
No. No, Council Member Leão.
All right. And do we have any public comments, Mr. City Clerk? Yes.
We have one speaker. Robert Gonzalez, WQA representative.
Good evening, Council Members. Mayor Robert Gonzalez from the city of Azusa. And I apologize for coming to your special meeting. I know how budget time can be. And I just want to take this opportunity to formally introduce myself. I am your Water Quality Authority representative. And I've been going around to our other neighboring cities to formally introduce myself as your representative. I also represent the beautiful city of Monterey Park. And I want to extend the offer at any time that we can do any presentations for you to let you know what the Water Quality Authority does We'd be happy to do so so without any further ado I know you guys are busy and this is a busy time for all of us at our Respective city. So I just want to take this time to introduce myself
Thank you. It looks like my calling Peter Chan wants to make some comments Councilmember Chan
Councilmember Robert Thank you for coming to Monterey Park. Welcome to Monterey Park. We know each other for some time but hope you will stay and enjoy the changes around this area. Or if not, next time I'll treat you.
Absolutely appreciate the offer. Okay, thank you for coming. Council Member, thank you.
Thank you very much. Do we have any other speakers, Mr. City Clerk?
That's it.
Okay, noting no speakers, moving on to new business, item number one, fiscal year 2022, 2023 budget. As you know, tonight is a special meeting and we are conducting our budget hearings at this time. So, Mr. City Manager, you can take the floor.
Thank you, Council Member Land, Council Members. Tonight you will hear a presentation from our Director of Management Services, Martha Garcia, regarding the draft budget for physical year 2022-2023. We're scheduled to discuss the draft budget until 11 p.m. or when City Council would like to stop and continue on May 31st at 630 here in the Council Chambers. Staff will answer any questions after each department representative areas. We also have our department heads available to answer any questions. And we have one department head that is on by Zoom because she is at a workshop. That is our Chief Kelly Gordon. All city departments have worked with the finance department to create the draft budget that works towards the goals and strategic programs following city council priorities and policy direction. Our focus remains steadfast on how we continue to offer services to our diverse community while remaining physical responsible, rebounding from the pandemic and economic uncertainties. The March 2020 unemployment rate has reached near-pandemic rates. The issue in today's labor market is the decrease of the U.S. labor force, which has occurred in the last 19 months. The city of Monterey Park is not immune to this very problem. With long-tenured employees, some known as the boomer generation, Retiring seeking employees to fill these positions continue to be difficult as the government employment market is extremely competitive. Balancing resources with service delivery continues to be difficult while the economy is in a recovery mode. property tax for property tax at 42 percent and sales tax at 19 percent percent represents 61 percent over half of the general fund revenue creating additional revenue through development processing fees and infusion of vacant businesses and properties are high priorities of our staff. We must find a financial balance between revenue and expenses while maintaining community services expectations. We will now begin our presentation with Martha Garcia. Martha? Thank you, City Manager, and good evening,
Council members. Tonight we are pleased to be presenting the annual budget workshop presentation
for fiscal year 2023. The overview of the budget and presentation includes the budget background,
the American Rescue Plan Act, ARPA, staffing changes, city financial plan, the general fund
reserves, expenditures, and expenditure reserves, the department presentations, capital, and the capital improvement projects, and then we will conclude the workshop.
The budget provides a roadmap to the city's successful delivery of vital core services
and infrastructure improvements.
A careful and methodical approach was taken in preparing the budget consistent with City Council's practice to exercise fiscal prudence. Department budget requests were scrutinized, considering essential operational needs, and limiting the ongoing demand on the City's finances. This operating budget takes the stance of status quo with escalations only where the cost of service delivery has increased and ARPA funds have been allocated. With that said, the citywide proposed budget for fiscal year 2223 totals $149.2 million, of which $50.5 million is general fund. How we develop the budget. The proposed budget includes $1.7 million from ARPA funds to fund part-time staff for public safety, the library, recreation, and community services.
It also includes $1.6 million in carryover funds.
These are ARPA funds that Council had previously approved for specific projects and are currently underway.
And then another $2.1 million for CIP projects. For a total ARPA funds are $5.4 million.
The budget, we also worked on full-time equivalent positions. The city's recommendation for next fiscal year full-time equivalent positions is 386. This includes the addition of two full-time staff. The city continues to budget the $1 million OPIP trust contribution. The budget includes the use of sales tax revenue bonds, which is also known to us as street bonds, to repair city streets. And the budget also includes an increase to departments for internal service charges that converts into higher revenue to respective internal service funds.
We're going to talk a little bit about ARPA.
Okay.
So today, City Council has approved or appropriated $6.9 million of ARPA funds.
As of May 18th, $1.9 million has been expensed, $2.4 million has been encumbered, and the remaining $1.6 million has been expensed.
I'm not saying this right. I can't see it.
And then we have, sorry, I'm going to start over.
$1.6 million has been appropriated. $1.9 million has been expensed.
$2.4 million has been encumbered. And then what we are carrying over into next year is $1.6 million. And then on top of that, we have $2.1 million that we're bringing to Council today for discussion on CIPs. and that's for a total of $5.4 million for next year's up of ARPA funds.
So the city continues evaluating its organizational structure
for the most efficient core staffing mix. This includes the 386 FTEs with two new full-time staff,
an information system specialist that will serve as the IT expert for the police department
in a full-time position in the Media Production Communications Division
to assist the community media specialist.
The City's 2223 Spending Plan, which funds public safety, community and economic development,
transportation, parks and open space, recreation, library, infrastructure investments, and city facility upgrades
is developed in the most responsive manner toward achieving the goals and strategic programs
following city council's priorities and policy direction.
This year is no exception that our focus clearly remains on how to best offer city services
to our diverse community as we maneuver through these times of economic uncertainty.
The city's final plan is $149.2 million.
That includes 50.5 in general fund. We have 11.8 in retirement, 9.1 in special revenues. ARPA is also under special revenues, but we wanted to show that line item for that, and that's 5.4. And we have grants, 2 million. Refuse, 7.7 million. Sewer, 5.5 million.
Water has quite a bit because when we get to CIPs, you'll see we're investing quite a bit in some of our CIP projects.
So that's $25.9 million.
Internal services is $15.2 million.
Street bonds is $13.7 million. And successor agencies is $2.3 million for a total of $149.2 million.
Council Member Hans, can I ask a question to clarify Martha? Sure, go ahead.
Martha, can you explain a little bit on the internal services?
Because throughout the budget, you have a lot of things in the internal service. So we'd like to...
I have a slide. Okay. In a couple of more. Okay, thank you.
So the citywide proposed expenditures includes, it's 34% of the citywide proposed expenditures is from the general fund, and the next highest one is water at 17%. And if you notice, we have ARPA is 4%. It's supporting our expenditures for next year, and an additional 1% of other grants. and then we have street bonds that are 9% of our budget this coming year.
We're going to talk now about general fund.
The general fund is the main operating fund of the city and pays for the majority of city services.
It is our practice to conversely,
conservatively estimate all revenues included in the budget to avoid over committing to future service expenditures.
So the property tax is an annual levy and is based on the value of land and structures.
Property tax constitutes 42% of the city's own source revenue.
Total assessed value for 2022 of properties is $8.9 billion, up 3%, or $278 million from last year.
Prices for single-family homes have continued to rise in response to Lor inventory and
interest rates.
County. The sale price of a detached single residential home in Monterey Park from January through November of 2021 was $830,000. Furthermore, the largest value change in Monterey Park came from various commercial industrial parcels located in North Atlantic Atlas Avenue and Monterey Pass Road. The parcels increased in value by $36.8 million. Total property tax revenue estimated for next year is $21.5 million.
Sales tax represents the second largest sources of local tax revenue.
The sales tax is imposed of the retail sale of goods.
In fiscal year 21-22, the city received corrected revenue from a misallocation of the Home Depot sales tax in previous fiscal years.
For fiscal year 22-23, the sales tax allocation is corrected and has been completed, and assumptions for the 22-23 include, is expected to be flat, and it includes the sales tax trends and economic drivers. and that and our expectation our anticipation for next year is five 9.5 million and it's similar to this current fiscal year because of we the home depot correction has been completed in this fiscal year the next is the city's utility user rates that are at three percent for residential and 5.5 for commercial users. The tax is applied by the consumption of electric, gas, and telephone
services. The overall utility user rate revenue is projected to increase by 1%, and that's based
on trends and historical data. The transient occupancy tax, also known as TOT, is imposed on rent of hotels and motels in the city. The current hotel rate is 12 percent. This amount of
1.8 million includes tax receipts from the courtyard by Marriott.
Other taxes. The category consists of property transfer tax and franchise tax. The property tax is the real estate transfer tax at a rate of $1.10 per $1,000 of value transferred. Cities and counties share the tax equally. This category also includes franchise tax that is imposed by the city on gas, electric, and cable television
for the privilege of using city streets.
Revenues and other taxes projected to increase by 3 percent. They are based on trends and historical data.
Business licenses revenues are projected to increase slightly in 22-23 as businesses are open back up and new businesses start to emerge.
The city is cautiously optimistic that revenues will begin to increase in this category.
Next one is charge for services. Charged for services, this category includes charges for fee-supported city services.
As we begin to recover from the pandemic, city services are returning to pre-pandemic levels. Thus, revenues in this category are expected to increase to pre-pandemic amounts.
Other revenue, this category includes investment earnings, rents, fines, and miscellaneous revenue accounts.
The city's overall investment return is expected to increase in 2022-23 as interest rates begin to rise.
The city is optimistic that other revenues will increase by 2% in the new fiscal year.
Total estimated revenue for fiscal year 2022-23 is $50.6 million.
Now we'll talk about general fund, internal service fund expenditures.
Internal service funds are established to account for any activity that provides goods or services to another fund or departments.
Internal service funds attain greater economy efficiency and effectiveness in acquisition and distribution of common goods and services used by other departments, and it facilitates the equitable sharing of costs among departments served. An internal service fund sets its rates to cover the full cost of providing a particular service. Departments have internal service fund costs built into their operating budget.
on a monthly basis finance journals, internal service fund billings to each department.
These billings then convert into revenue to the respective funds. These funds include technology, shop, workers' compensation, general liability, separation benefits, OPEB, and retirement.
In fiscal year 22-23, the general fund has budgeted $10.3 million to pay for services and goods from other funds or departments.
The police department has allocated the highest increase in costs at $920,000 versus city council has a decrease of $1,490. This has to do with the number of staff, the salary. all of these internal service funds are based on different criteria depending on what the fund is for.
Does that answer your question? Mr. Kemp?
No, but maybe some other time I want to clarify with you. Okay. On that because it's all throughout the budget you have internal service funds. But I need to understand more.
okay yeah can you just uh i mean just for me as well just give me an example of an item that would
be on a city council internal service fund technology for example technology is based on
so we take what the cost of the of the budget for technology is for that year so let's say it's a million dollars and then we have 386 staff so you take it by the number of staff and then you charge
each department based on the number of staff that each department has so you would divide the 300 something that you said by one million dollars yes and then those uh divided amounts if you have
three people from one group three people go into the public right bucket and then these people go
into the whatever and it just basically uh offsets uh i mean there's a there's a one-time
million divided into that and then that those separate pieces get put into those independent
Right. So you would be paying, so it would be in your expenditure codes.
You would be paying for that service, and then that charge, that payment that you made,
converts into revenue into the technology fund that then serves to fund our IT manager salary and all of our Wi-Fi and our servers and everything else that we need for our technology.
So in technology, would that also be the expense of specific hardware, like how all of us have iPads, right?
iPads, laptops, yes.
So then I would assume since we have up to five council members, that's five iPads,
but you may have another 10 people that work in another division that also get iPads, right?
We don't do it to that level. We do it by person and we do it by the cost that's going to cost the department or the IT division for that year.
And we do it based on the number of people. We don't do it to the detail of how many people have an iPad, how many people have a cell phone because that's not.
So basically it goes into a bucket of money that would address and pay those types of expenses.
Another example would be shop.
you don't have a city assigned vehicle so you would not, city council would not be charged for shop.
In the internal service fund? Yes. Thank you.
Then I have another question is on your citywide
financial plan. That's the
two slides back. Then there's the
proposed budget with the general fund
and all those retirements, grants, and everything. And you have an internal services of $15 million.
And, yeah, that's the chart. So what?
That includes all the other funds.
So, for example, when we're charging technology, again,
you have Public Works is the main one. Public Works, we have all of the water department or the water division.
that their salaries all get paid by water funds.
So 10.3 is from general fund. For those employees that are general fund,
their salaries are paid by general fund.
But then you have other employees that are charged by water
or by streets or by refuse.
Then those funds get charged for the technology
that those individuals use.
So mainly it's the spread, the technology.
but I think that this should be just one item. There may be more item under the internal services.
Oh, yeah, you have technology, we have shop, we have general liability,
we have workers' comp, retirement, and OPEB.
If I may add to the comment talking about internal service charge, There are specific departments that have funding from either enterprise or general fund, but there are departments that do not have a specific fund that supports that department, similar to HR, for instance. There is no outside funding that helps HR so they depend on general fund and an internal service charge to pay for the employees and all the things, the widgets that come to support that department. When you go through the budget, you will see the fund source type and you will see which departments actually get money, receive money from the internal service charge. That is a very good glimpse of the departments that do not have any additional funding coming into there with the exception of general funds.
So it helps us alleviate some of the general fund burden with the internal service charge. Does that explain what an internal service charge does for our city?
It's very simple. if you don't have funding to support that department then you need to have some type of internal service charge to actually supplement it by charging other departments an internal service charge we're able to support those departments so the cashiers that take in the money uh for our payments they're supported not only by general fund but also internal service charge if we were to depend on general fund 100 we wouldn't be able to afford the services
then what is the uh revenue sources of the uh internal service funds is it so is all everything from uh the general fund i mean not general yeah general the sales tax property tax and everything so you just uh assign a percentage into the uh service internal service funds isn't How would it work?
So an internal service fund is goods or services.
The revenue is called internal service fund revenue for a technical term.
But, for example, police department, let's use the police department,
their salaries and benefits their budget is paid with general fund money the general fund money
comes from property tax comes from sales tax comes from tot a small portion comes from grants and
other items so because they are for sake of make it a little bit making this a little bit clearer
or let's say that they only get general fund, that their whole budget is just general fund,
then that general fund is charged internal service charges,
and then those internal service charges convert to internal service funds.
So yes, the internal service funds are funded through general fund
that are funded through property tax, TOT, sales tax.
So there's no specific source of revenue. It depends on the person and it depends on the type of fund
and it depends on who uses those services.
For example, City Council does not use shop.
So you would not be charged for any internal service related to shop. But we would have to cover for workers' comp.
The expense part I understand. And I just want to clarify the revenue part.
Where's the money coming from?
The money comes from the charge.
So let's go to accounting terms.
I will debit your expense, and I will credit your revenue.
So that charge that the departments are getting, I turn around and put that money into, it doesn't leave the city. I move it from one bucket to another. So the money I'm charging the department for the services, and then I'm converting that into revenue for the division or the fund.
So there's no specific source of income. So there's no specific source of income or source of revenue for the internal service funds. ! So you just put a percentage of the public tax, sales tax, room tax into the internal service funds.
! It's all the funds. ! It's all the funds.
! It's all the funds.
! So you just put a percentage of the public tax, sales tax, room tax, into the internal service funds. ! It's all the funds.
We're doing everything efficiently and correctly. So yes, we base it on there's certain criteria that we use for each type of fund.
But all the funds will fund all the funds, the enterprise funds, sewer refuse, property tax,
all those funds will fund internal service funds depending on the criteria used.
so that means it's just a percentage of all the fundings
regardless of whatever sources that come in
it's not a percentage it's based on certain criteria
okay like what kind of criteria
for technology it would be people
for shop it would be cars
for general liability it would be salary and benefits I'm sorry, for workers' comp would be salary and benefits.
For general liability would be budget.
So simply put, you know, in layman's terms, it's just it does not have a particular revenue, excuse me, does not have a particular source of funds. It's just internally you create funding from all the revenues and say this is the internal revenue funds source. Yes. Is that my understanding? Yes. So it's just a creation, the internal creation of the funding. Correct. But that creation is a percentage or based on the criterias that each department comes up with, and then you put it into the internal service fund revenue.
But still, all the funding is coming from sales tax,
public tax, enterprise, license, grants, penalties, whatever.
It's not so much a percentage of what the department has. it's about what goods and use the department uses across the board that relies on internal service charge so if a specific department uses all the goods obviously they're going to pay a higher internal service charge if they have minimum use for those goods they're going to pay a Lor internal service charge it's not so much a percentage though I just want to be clear it's not
percentage that's that's fine because i i'm okay with the expense part but the revenue part is it where's my question simply question the simple question is where's the money come from that's
what i don't understand let me let me if i may uh let me try to see if i'm getting it right and uh okay so let's say i'm just going to be hypothetical here right we take in monies from you know all sources with property tax etc that comes in our general fund so let's say for example one of the people that are handling the water bills okay like they they're the ones that process it and do whatever in our in our city hall let's say they don't they're not a budgeted item or under any specific bargaining team or whatever so how do we get them their salary to get paid every time they engage in a service of doing this paperwork whatever and doing that there's a calculation that that's worth about this much money in terms of the service provided and then based on the number of times that service provided let's say it's ten dollars each time hypothetically that if you did it five times then it would be a $50 charge to an internal service fund to offset it and thus it's still coming from property tax and everything else but it's just being used internally as a way to fund positions that provide services for example if you have water bill people that are doing water bill then when they provide the service you would be billing the water fund for the internal services because these people are providing a service for your department the water department and thus that costs money and it's not in our general fund because it's not an item on one of our whatever right it's an internal service fund that gets funded as those services are provided, and then the internal department gets billed saying, oh, your clerk processed five bills. So at $10 rate per bill, we're charging the water department 50 bucks for that service. Is that correct? Am I getting that at all?
Yeah, you're getting it, yes. Okay.
So the revenue still comes from taxpayers and all that, But when it comes in, in order to pay for auxiliary services and stuff like that that are not normally budgeted, internal monies for services based on the service provided is set aside and billed to whichever department is getting the benefit of that service. Correct. And it's not a percentage because you don't know what the expense is going to be. Like, let's say one year from another, if there's a service that they're providing, maybe the cost of the service goes up.
Right, correct.
So what you would do is you would add all the expenses based on the current expense You would divide it by the number of people that would get it and then that number equals a percentage of the pie But you're not selecting a percentage as in the beginning to say Internal service fund is going to be X percent of this budget. That is that's correct. Yes. Okay. I Don't know that
Yeah, well because government finance is different than the ordinary accounting principles. And so this is my, I got a hard time to understand that. It happened last year. It happened again this year. But I just want to use that chance to, you know, better understanding. But I do that. It's just an internal accounting method that, and I assume that it has criterias, as you mentioned, and guidelines on how to charge the revenues into the internal service funds. I believe that that should be the case and is approved by the accounting board or, you know, whatever. That's the government expenses or the finance. So I assume that has that. But maybe later on, give me those criterias, then I can have a better understanding. do that yes yeah now I understand that this is this is an item that that internally created to get the to fund the services that has no particular categories or whatever terms you want to use it but but you need to since you have an expense you have a debit that's why you need a credit to offset it so I I assume that's the case. So it's still part of all the funds that we received. It's not an extra service that we provide. It's internal revenue funds. It's just a creation based on the accounting and expenses. I think that's my understanding now. So thank you for that. But I would like to take a look at the criterias and conditions and the guidelines later. Thank you.
Okay. Thank you. So next we'll move on to general fund expenditures. The general fund expenditures increased for police by $1.2 million and fire by $828,000, and that's mostly due to the increase in internal service costs. FTEs in the Community Development Department are fully funded in fiscal year 22-23. Therefore, general fund costs increased by about $429,000.
General administration costs went up about $613,000. That's because $332,000 is related to the transfer of the media production and communication division. It went from Recreation and Community Services Department over to the City Manager's Office.
So that whole budget moved from Recreation and Community Services over to the City Manager's Office.
In both the library and Recreation and Community Services fund expenses decreased. A combined total of $542,000, the city is using ARPA funds to pay for part-time staff, therefore reducing the general fund expenses and maintaining pre-pandemic library and recreation and community services. The proposed general fund budget for fiscal year 22-23 is $50.5 million.
Next we'll be talking about general fund reserves. And before I start this slide, I want to point out that the budget message has an error. The budget table under general fund does not include the good views impact on the reserves. I will be correcting that in the final budget book.
I just wanted to ask, do we know what that number is?
So it's on this slide?
Okay.
So the fund balance are often used to bridge economic cycles or weather emergency times so that community service can continue to be provided uninterrupted. Adequate fund balances are an indication of sound financial management, Total general fund reserves going into 2022-23 is projected to be $32.7 million. At the June 30th, 2023, reserves are projected to be $20.7 million. This reduction in reserves is related to the $12 million the City anticipates to pay for the Good Views project during the 2022-23 fiscal year.
Do you have questions on that one? Yes, that's kind of like, just wanted to clarify that the unassigned under 2223 becomes a zero. And thank you for pointing it out. And I think it's good that we know that the unassigned portion will be depleted to zero. So either we have a deficit in the budget, so is there any reason why it's from $4.4 million down to $2.6 million and then down to $0 million? Can you elaborate on that? So in 21-22, we anticipate to spend some of the unsigned for the Good Views project.
We also have some capital improvements that have been from assigned projects that are being built.
Some of it is some of the payments that we still are finalizing with, like, the firehouse, the new firehouse.
So in 22-23, that's just $1 or $2 million for, I think it's $1 million for good views,
and the rest of it is for other expenditures that we're expecting. I checked on our munis, and we had about $1.7 million already spent from the assigned
that would bring down our reserves.
In fiscal year 22-23, we're anticipating to spend $12 million for the Good Views Project. And if you notice the difference on assigned, it's dropped by about $10 million. And the difference in unassigned is dropped by $2 million. And that just shows the difference of the $12 million plus, I believe, let me look at the book.
at this time if i could while martha's looking it is now 7 15 and the mayor has arrived so i have
passed the chairing duties to the mayor thank you and thank you for bringing the meeting
our operating revenue or operating revenues and expenditures for 22 23 are expected to have a
surplus of $56,000. So that along with the $12 million is what makes that adds it in and then along with the $12 million is what brings us down to $20.7 million. It's purely good views. It's
creating this in our reserves. Okay. Yeah, because when I see the fund balance or the reserves becomes zero that kind of trigger some kind of alarm. And that's why I asked you to explain it. And good that it's just kind of like one-time expense because of the Goodwill situation. That's the slope on Gavi that endangers the lives and poverty because it's a dangerous slope. So that's why the city has to put in money to rectify and put in the safety factors into that area. So I understand that, but also would like to ask the council and staff to look into the situation because I can see in the later presentation and in the book, it says on 23, 24, 24, 25 also becomes zero. There's no nothing in the unrestricted. There's no nothing in the unrestricted fund balance. ! Although it's a future in the future, ! But I think it's a good thing, and I want to thank you to point it out ! so that the council and staff understands that this is something that you have to look into. ! because zero is a very alarming number. ! And we need to build up the reserves. to build up the reserves and good that we can prepare. So this is the time to prepare for the future, and that's what the budget is all about. So I want to thank you for pointing it out instead of hiding it or saying that, okay, we're fine, we're good, and then we don't look into it, but now give us the attention. The zero really draws the attention, and then we have to somehow rectify it or create some revenue sources or whatever that is to address this issue. So I want to thank you again for pointing it out because it's really alarming. Thank you.
If I can just comment, and City Manager, if I'm speaking where I shouldn't let you know, right? But while the city had allocated that $12 million to do the slope, that didn't just come out of our pocket and we have no recourse for that. I understand that there are liens on property owners. Is that correct, right? That has secured that money. So while we do want to look for revenues, I think that as the years go by and it gets settled, that $12 million should, I would think it would come back. I don't know if that's an accurate statement or not.
You're correct in that statement that we are, We have already leaned the property for costs that we've incurred so far. We are intending to lean the property probably, you know, at each quarter for the money that we are spending towards mitigating that property. I will also point out that besides talking about it during the budget, we've also annotated the spending of this money in a note for the assigned capital improvement. The note is number two, and number two states estimated cost for Good Views project is $17 million. In FYI 2223, unassigned and assigned funds are reduced by $12 million, and in 2324, assigned funds are reduced by $5 million. So not only are we talking about it, it's actually in the budget book too. So it's very clear and it's transparent. and we do have staff reports that council has taken the position that the health and safety of the community is extremely important. Important enough that you need to spend some money to mitigate that problem and we thank you for that.
And I want to point out that because although it is in the lien and in the legal process and usually it takes long time to settle. So the money we may recover but as for when we don't know. So that's an unknown. So at this time, I think we have to find out some ways to replenish that deficit, the $17 million expenses that is going to be incurred. So instead of just relying on the property owner to reimburse the city, because it may be under litigation and it may be two, three years down the road, but we still have to face the deficit that we are looking at. So look at some creative ways or some source of revenue. That's my suggestions. Thank you.
Okay. The next slide is capital improvements.
This next year's proposed budget, 22-23, includes $9.5 million in enterprise capital, 12.9 million in street construction and 3.1 million in community capital improvement for a total of 25.5 million. And we will discuss it in further detail when we get to the capital projects.
And that ends the summary.
Is there any more questions before we move on to departments?
No?
Yeah, I just had one, just one quick one.
Let me see if I can find where we are here.
Yeah, I was just curious.
On the revenues, on the TOT, it was approved at 1.9 initially, and it came in at 1.5, estimated for 2022-23, 1.8.
Do we know why, was there reasons why it came a lot Lor than what the, you know, did the pandemic or staffing issues kind of prevent that goal from being reached?
We were anticipating that the Marriott would open up sooner than it did. So the 1.9 included the Marriott opening up a quarter sooner.
okay yeah because i remember initially when they opened you know we uh you know i had a chat with the owner and i was asking him about occupancy rates and he says oh we're at 84 percent which i thought was good and then uh this is you know pandemic post-pandemic and he said that we it's not that we couldn't accommodate it there are people that want to come but we just don't have the staff to be able to man like a full full occupancy so i was just curious in terms of you know i saw that that was uh you know there was a difference there and i'm just curious whether or not you know that that was a factor that you guys noticed you know in terms of the reduction and then also I didn't know uh I thought that was exclusively it but I I forgot that there was a delay in the opening uh because of COVID obviously so um yeah I would we wouldn't have been able to meet that projection or I mean it would be difficult to be completely accurate given the pandemic and the uh consequences of that so thank you that's all I have
Okay, moving on to departmental
Actually, I have a quick question. I saw that for the estimate cost for the Good View project
is $17 million. And then so the unassigned and assigned funds are reduced by $12 million. And then also the assigned funds are reduced
by $5 million from the 23 to 24.
So I want to, yeah, I understand the general fund reserve that
we reduced the $12 million and also reduced the $5 million, which I found. But then where do you credit it on the $17 million?
The $17 million falls $12 million in 2022-23 and $5 million in 2023-24.
So which actually spreadsheet that you put it on for the $17 million, the cost?
It should be on page 515 515 yeah, and if you look at the assigned it dropped 5 million on top and then
Plus an additional drop of 291
Thousand because we will not have we will be depleting our ARPA funds and we will have if we continue to continue to have that level of service
we would be at a
We would have a unbalanced fiscal year in 2324 or we would have to reduce services
So use a page what page 5 5 C 15. Oh
Thank you
Moving on to department
Presentations yes, you matter you
Are you good? Yeah, I'm good. Go ahead, Martha. Okay.
We're going to start with the police department.
So our police department budget for this fiscal year is $23.9 million. They have no FTE changes at $126.25. They have no significant changes for $22.23. Their major accomplishments included installation and implementation of a trucked encrypted radio system and transition to the ICI regional public safety communication system, as well as a hosted radio management system. The system's 11 trucked cells and 37 repeater sites blanket virtually the entire 4,500 square miles of Los Angeles County with digital radio coverage that can be assessed by all member agencies and their resources. Another accomplishment includes coordinating the implementation and reporting of the compiled data to the California Department of Justice as required by the Racial and Identity Profiling Act, Assembly Bill 953.
They also received $114,000 from the California Office of Traffic Safety to enhance safety in the community through DUI, detracting driving, pedestrian, and bike enforcement operations.
The overall goal was to Lor the number of both injury and fatal collisions. Another accomplishment includes on three separate occasions, patrol officers administered life-saving techniques and saved the lives of three individuals. In all three of the situations, had the officers not taken action, it is highly unlikely that the individuals would have survived.
And another accomplishment is the reestablishment of the gang resistance education and training.
the GREAT program, in partnership with Alihambra Unified School District. Some other goals for the fiscal year coming up, 22-23, include to conduct two bicycle safety rodeos to educate riders of all ages on safe riding practices.
The Animal Services Bureau will conduct at least one low-cost vaccination licensing clinic during the fiscal year.
implement dual cellular modems in all squad cars.
This will provide a backup internet connection in case of preliminary primary fails and develop a program that provides transitional housing and emergency housing to meet the city's needs of the unsheltered population
that will be supported through service providers who will provide case management.
And that ends police department.
Any questions on the police department?
Councilman, any questions? Yes, Councilman Chan.
Yes, on L7, we talked about that too. I asked, that's the internal service. service, but this kind of like increased closer three times from 21, 22, the original budget
is 168,000 goes to 421.
But then the projected is the same, but it has a big increase from 2021, 47,000.
also more than three times to $168,000 and then another three times extra to $421,000.
So can you... What's the increase?
The revenues.
The revenues to the other funds increased.
Therefore, the expenditures increased.
So it's just also the same thing, the same explanation
that are those that are not signed areas then we just yeah that same the internal
service that same 421,000 is going to convert into revenues into their
designated internal service funds okay okay and and on the goals and objectives I would like to for the 22-23 budget because we do have a few fatal
accidents in the last year last fiscal year and people got you know run under
by the car and and and it's not good and then also the in the school
pick up and drop off times. You know, a student was, you know, had an accident lately. So can you put into those safety things, these pedestrian safety, including students, and also the pedestrians' safety into their goal?
Our police chief will answer that question. Council Member Chen, if you refer to page L11 within the budget book, the goals and objectives that were provided as part of this presentation were just a few highlights. One of the specific goals and objectives of our Traffic Bureau is to conduct four community traffic safety presentations to educate students and the public on the topic of pedestrian safety, bicycle safety, and safe driving practices. there's also conducting weekly radar enforcement areas where speed has been identified as the primary collision factor another goal and objective is identify the five highest traffic collision locations per month for enforcement of primary collision factors we're very aware of these issues we did receive the OTS grant again this year and we understand your concerns and we'll be diligently working to decrease those
okay thank you that and just just bear with me I have a few things actually can't while you're
looking can I ever question to what your question was I have a follow-up question to I have a follow-up question to what you just asked.
! I want to ask Chief Gordon regarding...
! No, I'm still... ! Oh, sorry, okay. !
Oh, you have some other question, I can come after you. ! ! Okay.
continue.
Yeah, but if you have questions you can ask first.
Dr. Okay.
Well, I was curious because Catherine Chan asked about the traffic safety, especially pertaining to speeding
and collision. I'm just curious, Chief Gordon,
where are the current areas that have been identified as areas where speed has been identified
as primary collision factor? Do we know like, are there what spots or where around the city have they been identified?
We do a monthly, it's broken down monthly. I don't have the current month.
Actually, the top intersections for traffic collisions, and I don't have the primary collision factor with that,
but I can tell you that the highest intersection for, and that's for this fiscal year as of May, was Atlantic and Cesar Chavez, which was seven. Now, those aren't all injury, but that was the intersection with the highest number of collisions within the city so far this year.
And then the top, believe it or not, the top primary collision factor for our traffic collisions is not speed. It's been improper turning.
but every month our traffic bureau looks at all of those provides um what the highest the intersection with the highest collision as well as what our primary collision factors are so that enforcement can be done appropriately in the areas that we're experiencing uh the highest number of collisions and focusing on the primary collision factors that we see are the
highest. Okay, thank you. Okay, thank you, Mayor. And Chief, while you're here on page L14, the capital out late, $511,214. Is it the six vehicles that we purchased? Is it what it is, and what does it include? What else does it include?
I believe so. I'd have to make sure with Martha, but I believe that that is still vehicles. That includes vehicles and then the conversion of the vehicles.
Okay, thank you. And then on the animal services,
I know that our former chief, Jim Smith, would like to talk about it, the coyotes.
So do we have any latest on the coyote situation? Because I took a few pictures that ran by my area lately. So what's the situation on the coyotes now?
There really isn't any difference than in years past in terms of the coyotes. this happens to be the end of their what's called their mating season so the recent uptick in activity is because now they've had their pups so everything that we're experiencing is within what are what would be considered our normal in terms of coyote sightings i see okay they are
friends I think and then on on the jail L 26 and I can see before we have the
fee paying prisoners and now we don't have any so so on 2020 21 weeks of 15 and now we have no fee-paying prisoners.
So is there any reason for that, or we are not discouraging people coming into use of jail or what?
So that is typically that revenue is generated what we call our self-pay program. So if someone has low-level misremory offenses and they choose to pay for their stay, we call it pay-to-stay. They can do it within our jail facility. We can also house federal inmates. But due to the pandemic and concerns of exposing our staff to unnecessary risk and also our officers and the day-to-day in and out of the individuals that we book, we have not returned to those levels. We also have been short a full-time jailer due to retirement. So in order to appropriately staff and manage it, we have not returned to accepting pay-to-stay inmates.
I see. So this situation may stay for a while. Yes. Okay. And the question is, are we still charging the same level of charges like $70 something
dollars per night? I think it's currently a little more than that, but we have not increased our rates at this point. Okay. Thank you. And then on the... And just to clarify, Council Member Chan, I think we're up to, and I'm going to double check right here, $104 is what we currently charge per 24 hour period.
Okay. I think we still lose money for that.
Even the motel charged that.
Yeah.
But anyway, on the computer services, I think in that category is that I know that we have a few, half a year ago,
that we have a system that has the auto-license readers. So how does it work? Has it been implemented? Is it up and running for that reading device?
So we've had automated license plate readers on some of our vehicles for a period of time. We also have the Flock camera system, which is used within primarily our investigative bureau. And it's been very successful in terms of the leads that it has provided us in investigations.
Okay, so it's more likely for the investigation and not as much as into any traffic violations, right?
It is not used for any traffic violations at all. It's used as an investigative tool to investigate a particular crime.
Okay, so it's good use, I think, I assume.
and then yeah I want to thank on the community
the community engagement team and I think that was good and last council meetings you have the
like what seven or nine police officers came into the city hall to present themselves
and I want to thank you for that. And like I said last time,
we still would like to continue the Labourhood Watch and the community service. So please continue that.
And then, of course, the homeless and everything is under this team. I think they can do a good job. So thank you for that.
And that's my question at this time. Thank you. Thank you, Councilman Chen. Councilman, are you?
Yeah, hi, Chief Gordon. I actually have quick questions about the L26 because I actually not only look at the preliminary budget,
but I also have the last year preliminary budget right next to me. So the number seems like quite different because what you projected last year is 100 people,
fee-paying President Book is 100, but then this year is zero. So I wanted to know, is there projected somehow was totally different than actual happen?
So we projected last year based on what we thought we would be able to come back and move back to having the fees and having the self-pay, and it has not been safe to do so. So, yes, there's a significant difference because of that and what we just talked about with the self-pay. And rather than overestimate, we took the safe route in projecting this and went with zero. So if we're able to go back at some point next year, then that's great, AND WE'LL MAKE THOSE ADJUSTMENTS AT MID BEAR, BUT AT THIS POINT WE'RE PROJECTING ZERO. OKAY. THANK YOU.
THANK YOU, COUNCIL MEMBER. YOU? ANY OTHER QUESTIONS, COLLEAGUES? OKAY. ACTUALLY, I HAVE A QUESTION.
I'M REFERRING TO L36, AND AGAIN, THESE ARE A GREAT LIST OF ACCOMPLISHMENTS WE'VE ACHIEVED AS WELL AS OUR GOALS for the future, especially in the focus on community engagement.
I wanted to ask, in light of unfortunately what happened in Uvalde, Texas yesterday, are we also reevaluating how we engage and collaborate with our local school districts, especially making sure that student safety is always paramount?
Student safety is always a paramount. We are conducting extra patrols and taking the necessary precautions. We have very good working relationships with all of our school districts. I've actually also been in touch with Chief Ramirez from the LAUSD. We have a bit of a unique challenge in our city because we technically have five different school districts that we engage with. But we're very committed and we always make safety our first priority. and we have established very good working relationships with all of our districts and we'll continue to make sure that we are providing the highest level of safety that we can for our schools.
All right. Thank you.
Okay.
No other questions?
Okay. Thank you, Chief Gordon. Thank you, Martha.
Next, we'll move on with the fire department.
the fire department's
proposed budget for fiscal year 22-23 is
15.9 million
total FTEs is 66.5
they have no
significant changes in their proposed 22-23 budget
major accomplishments in
21-22 include
completed the fire station
62 rebuild. The community risk reduction division completed a technology upgrade of the EOC which included
new displays, new Chromebook computers for the EOC
disaster operations and improvement of the internet network access points. They collaborated with various contractors for the construction of the new fire station 62 and the courtyard by Marriott project to facilitate the fire clearance for tenant occupancy, comprehensive review of the installation of the fire protection systems under construction at the Holiday Inn Suites, Shell Gas Station, Starbucks,
and Raising Canes.
They also provided comprehensive training to all fire department members on the functionality of the recently purchased tri-band radios for the public safety intro pairability. Goals that the fire department has for 22-23 include review the feasibility of rebuilding or relocating fire station 63. The community risk reduction division will provide the following training opportunities
to improve community risk reduction, disaster preparedness, and public communications.
resident teen cert training city staff cert training and city staff EOC drills
then another objective includes expand tech tactical medicine training to all
memberships through UCLA that concludes for the fire department
Thank you Martha. Colleagues?
I just have a really quick question. You know we're having the preliminary budget
discussions right now but given that we're also in contract negotiations with
a number of our units once that's concluded
how is the budget amended to reflect that?
It will depend on when it concludes. If it concludes on June 1st I can bring him back on June 15th.
Or even if it concludes on June 15th, I can also...
Well, if it concludes on June 15th,
we would have to request an augmentation for July 1st.
Okay, so there's a normal practice for that, right?
Yes.
Okay, thank you.
Council Member Chan? Yes.
Thank you, Mayor.
I think... Fire Chief?
Yeah, I see you. Thank you.
On the budget is concerned, I really don't have questions for the budget because it's pretty much a status quo from the last year's budget.
and good that we have fire station 62
and good that we have fire station 62 build and fully operational now and I know that in your goals
! You know for the next fiscal year is going to rebuild and relocate station 63
! Monterey! Monterey! ! Monterey! Monterey! ! Monterey! Monterey! ! Monterey! Monterey!
it's sustained some damage from earthquakes and also the fact that it was built in 1957. The size of the station itself is not truly adequate to house the equipment that we have today. So that along with the damage and in order to make the station more suitable for diversity, it's probably time to look into either rebuilding it, finding a different location within the same jurisdiction to rebuild it. So it's something that's on the fire department's radar screen along with the city to explore those options now Whether that happens in the next year or multiple years. It's a long process and it'll take some time Not only for the location, but also the funding, but it's just something that has been proposed and Something that will be needed in the near future
Yeah, I understand that the six fire station 62 takes what at least five years
It took a good amount of time from purchase of the house behind the station to where we are today. Probably a good five years.
Right. So it's time to prepare and project and forecast the needs of the future. So I thank you for putting that into the future plans. I think it's needed. The most important thing is where we get the money. Absolutely.
because I think it will be also a few million dollars just to rebuild it, not talking about relocation. Relocation maybe even more because you have to buy the land. But, of course, we can sell the existing lot as well that will have some money coming back. And then my next question is that because we have the RENA numbers
and 5,200-something units in the next eight years or so,
And then the city has also passed the zoning changes that alLod mixed use and higher footage on the buildings. So you may go to three, four, or even six stories.
Are we prepared for those new buildings that may be coming in the next few years?
Absolutely. You know, we're always tracking changes to call volume, call types. and also the structures within the city itself. So we have the necessary equipment, and we train on a regular basis for those types of locations. A perfect example was when a North Atlantic building was constructed right there at Hellman. We trained leading up to the construction, because that was going to be one of the tallest buildings that we had in the city. Our aerial truck is capable of reaching those higher levels of those floors. So that is something that we're prepared for in an event that we weren't we would certainly add that to our list of things that we need to Look to the future We're talking increased population which it could include increased call volume call types So yeah, we're aware of that and we track that through our data software on a regular basis
Okay, thank you and my last question is I don't know how to resolve that is to fight fire you need water so with the water you know we're in a drought situation so how can we look
forward and how do you you know tackle that well you know it's water puts out fire and so even in a drought we we are careful with how much water we use and we're very cognizant of that outside of fires you know we train on a regular basis and we are limiting the amount of water we use if at all because it's all about optics and the city has to be fiscally or uh responsible with regards to water usage including the fire department so unfortunately we can't get away from utilizing water to put out fires because that's the most efficient and safest way to do so but we are cognizant of the fact that we're in a drought and we don't waste water or we're concerned with conservation just like everybody else
Thank you, Chief.
Thank you, Council Member Chan. Council Member Yu?
Yeah, hello, Chief. Actually, I'm looking into your department budget summary, M2, I think, for this year,
but then I compare also for last year, which is L2.
So I'm curious to know that your emergency operations,
that it's actually increased almost a million dollars compared to what we budgeted last time.
So would you be able to explain a little bit what happened this year?
Sorry, actually, 2021 has increased to $9.3 million,
but then we budgeted about $8.5 million.
so the increase to those operations would be the internal service funds
ah internal service fund okay and um yeah when you talk about internal service fund that yeah that is a question that comes out um on m3 which is internal service um that's how i compare to last year that I see that I think you guys moved internal service one this year I think you have like 257 I mean 250,000 but then compared to last year that you put on a budget is 3.2 million so it's actually a very big difference that you I think you recalculize your internal service compared to the special revenue because the special revenue last year was really low is like 650 but then this year you bump it up into wow like you know from 4 to 4.2 million to 1.7 million so it's actually very different from the two years can you explain that I can explain that
4.2 million we didn't have the POBs back then so they were it was a higher cost we don't have those anymore so now it's dropped to the to the other the 1.8 for this coming fiscal year.
Oh because of the POB? Yeah the retirement fund which pays for the POB which the POB gets paid out of that. That retirement fund is considered under a gap it's considered a special revenue because it's specifically for
pension. Right but then for last year you only projected 600-some thousand. So it's actually quite different compared to the last year. What page? No, actually, I put two years together. So M3, and last year was L3 is a different section. But then all the number that projected is not the same as this year actual. So I'm just curious. It's actually quite a big difference, too. Last year for special revenue, I just read it to you, is about $650,000. But then this year, the budget, the first category actual is $4.2 million. And then, you know, I dropped it to $1.7 million, which you explained about the POP. You are correct.
And that explanation is that we had originally categorized it
as an internal service fund
because we charge departments as an internal service fund. But the revenue is a special revenue, not an internal service.
So we spoke to our auditors and they had us change it.
So while you'll see it as charged as an internal service fund, it returns us a revenue into the special revenue.
Right, right, because I see, you know, you guys switch a big amount between internal service fund to special revenue funds. Okay. Yeah, I kind of wanted to confirm that. And then so when we speak back to the previous emergency operations that you mentioned, she mentioned about internal service. So I have another one that question about community risk reduction. Community risk reductions that, I'm sorry, that I compared to also last year that day, you guys have about only 250,000. But then this year we jump it up to almost like, you know, 800,000. So I wanted to understand, is that just 2019 to 2020, that is one year of very low expenses, or is that just supposed to be in your $800,000 category?
What page is that?
Actually, it's Community Risk Reductions on M2, page M2. I'm talking about the department budget summary. So it was really low. it was like $250,000, but then jump it up all the way to almost half a million dollars for this year. So I wanted to see is there any difference that we have done.
So if I'm looking at the summary for actuals for 2021, community risk was $800,000.
$18,000, and then the original projected was $775,000.
Right, but then the one more previous year, actual, is only $245,000.
I would have to look at the detail to see what cost the drop.
It could have been that perhaps the fire department budgeted less in services and supplies.
There could have been a transfer of an employee from one division to another.
There's a lot of other little things that could have cost that drop.
Right. Okay. Okay. Thank you. No more questions. Thank you.
Thank you, Council Member. You colleagues, any further questions? Okay. Thank you.
Next will be City Council budget.
The City Council's budget is proposed for next fiscal year is $227,000 with five full FTEs. There is no significant changes for 22-23. Major accomplishments included conducted community outreach and input regarding potential revenue measure, adopted 21-22 housing element, implemented quarterly community cleanup events
to support the annual spring cleaning event to enhance the appearance of the community
and enhance public art at various parks by artistically painting the Lions statues
that were originally installed by the Lions Club.
Goals and objectives for next fiscal year include the development of the 22-23 Strategic Plan,
listing priorities, goals, and objectives.
Conduct a community needs survey to assist in providing city council guidance about the needs and priorities of the community members.
Any questions?
Colleagues, questions?
No? Okay.
Okay, hearing you. I have a question for your goals and objectives.
What is the timetable for rolling out the needs survey to the community?
We are projecting to do the survey like in September. We've already brought the contract to council. I don't remember exactly what canceled it, but it's already been approved, the contract with FM3, and they'll be conducting it sometime in the fall.
Okay. And this survey, is it based on mailers or in-person cabin thing?
No, they normally do it through e-mails and through mailers and through e-mails and through phone calls.
I see. Okay. All right, thank you.
Moving on to the city manager's budget. The city manager's proposed budget for next fiscal year is $3.9 million. Total staff is $8.7 million. Effective fiscal year 22-23, the media production and communications program, which was before Division 6509 is no longer under the Recreation and Community Services Department. Instead, it's assigned to the City Manager's Department Division 1209.
Major accomplishments include
initiative maintenance and hillside stabilization for the Good Views Abatement Project, spearheaded
partnerships to provide community vaccination and testing
clinics for COVID-19, reopening of city facilities for in-person programs and services,
successfully launched Monterey Park Rewards on an innovative smartphone use shop local app
created to address the struggles that local businesses face during the pandemic by rewarding
residents and visitors for shopping and dining locally, an organized and conducted COVID-19
Economic Recovery Task Force meetings comprised of various community stakeholders and economic development partners to provide the city with recommendations for economic recovery during
and post-pandemic.
Goals and objectives for next fiscal year include to continue to implement the communication and marketing plan to improve and enhance aesthetics of materials and communication efforts, continue hillside stabilization of good views, evaluate, study, report, and provide recommendations to enhance community transportation, evaluate current and future city facilities, space, needs, and provide recommendations of viable solutions. State. Create a new economic development strategic centered on collaboration across city departments. This EDAC and BIDAC businesses, nonprofits and other community stakeholders encourage reinvestment and economic growth by attracting retaining and expanding businesses and high quality developments that reflect community values enhance the local tax base and increase living standards for Monterey Park and leverage the LVC. and Contel Facility and Economic Development Partners to provide local small businesses, startups, and entrepreneurs free and low-cost expert consulting, practical training, and access to resources for growth and long-term success.
Any questions? Questions, colleagues? Council Member Chan, and then Council Member Ryu.
Thank you. and the budget is concerned
I don't have questions on it because also it's status quo but
the way I see the city manager's
role is very important because the whole city is
under your control. You are the CEO of the city, I mean in commercial
terms and you control everything.
But I can see that and I've been talking to the city manager
before he said the economic or community
development, we should have an independent department.
Now he's under you. But now I can see in your that you took in the communication the
you know, the broadcast, you know
the marketing and
everything under you. So I think you take on too many responsibilities. And it's good that you're
on top of everything, but it is your hands on. And then, you know, I don't know, you may take too
much of your time or too much of, you know, those little things that because you're is under directly
under you, so you'll be responsible for the personnel, for all the big things, small things
coming in, and that may, you know, take a toll on your, you know, your physical or mentally. It may be, you know, under stress, and I think the city manager should be, like, not to do the
hands-on but to overseas that the policies and all the things are carry
out properly and then you address you delegate the authority to the department heads and let them carry out you know your part well the policies is from the council but then you carry out the operations and implementation and
execution of all the policies and directives from the council and of course Council we take suggestions and needs from the residents so it's just kind of
like step down to you know the operations and so forth so just my suggestions that I think you may be you're taking too many burdens or taking too too many responsibilities and so would like to I don't know if you can
handle that or and still you know functioning you know properly as a city manager so just just my
suggestions any managers respond mayor council members mayor Chan I appreciate your concern for my health you and my wife and probably the rest of the team out there I think every once in a while they do ask that same question but I am in a very good position because the staff that we have whether it's the executive team the middle management staff on the ground they're extremely good at what they do when you create a vision our job is to implement it and my job is to oversee and make sure that we execute it so they take very good directions they enhance the programs that you bring bring forward to us and they're very good at what they do so it makes my job I wouldn't say easy but it gives me a more comfort level that I can provide much more oversight than actually hands-on there are times that I do get hands-on because it's important to you all and they understand that but other than that I think we're in a pretty good position right now going back to economic development as you know we pulled away economic development from community development it used to be underneath community development department we're slowly rebuilding that department there may be a day that economic development may go back to community development but at this time as we're rebuilding community development it wouldn't be a good time for them to take that on as you remember it might have been before you all got elected that economic development used to be in the city manager's office and then it got transferred down to community development. But that's something that we are looking at. When that time comes, we're not sure. But I think we're in a good place for now. But I appreciate that comment very much.
Thank you, City Manager. Ms. Yu?
Hi. Actually, I have questions about the department budget summary on page E2. so I'm looking at the second line under the expenditure SA for former RDA
and that one the actual is 13 million but then you originally budgeted 2.25 million so it's actually a big jump but when I look into the history for last year you also projected about 2.7 million
but then actually for 2019 to 2020 is actually $5.3 million.
So you guys projected $2.7 million and become $5.5 million. And then you guys projected another $2.7 million and boom, become $13 million. So can you explain, you know, what that is?
I don't have the answer to that right now. But these are successor agency funds. They come from L.A. County to pay for two bonds that we have. and there might have been my it would probably have been that we paid extra for another bond that year but I can totally look into it and tell you what the $13 million was for.
Mr. Bo, do you want to also respond?
Thank you, Mayor, Council Members. I do remember, I'm not sure if it was last year
or maybe the tail end of the year before, we did have to pay an obligation.
That was something that we talked about with our city attorney
that was owed to the county that had to do with the successor agency,
and I do remember that we actually paid that off. I'm not sure what the exact number was, but it was a big dollar figure.
That was $7 million, and that's what's affecting that, yeah.
Okay. And also, second question would be, I understand that I think you moved the media productions and communication programs to the city manager's department. is no longer under Recreations and Community Service. And may I know why?
In most cases, I think the community wants to make sure that all the communication that they're getting is streamlined. And at one point in time,
we did a good job of releasing information throughout departments, but majority of the communication that comes out of the city should come from the city manager's office. It should be filtered. It should come from the city manager's office. Each department does do press releases, media releases. It actually goes through the city manager's office for filtering to make sure that not so much they may be doing some type of media release that might not be beneficial to the city, but just make sure we're not providing any controversy out there. So with the city manager's office, kind of the collector of the information, we try to orchestrate the communication out there to the community that also includes social media that also includes our media production so it just made sense that the whole communication aspect is led by the city manager's office now going back to council member chan's uh you know comment you know i'm taking on too much i'm just very fortunate that we have a wonderful assistant city manager and Inez Alvarez is doing a great job because she's leading the group for communications and she's also taking on technology so hats off to her that she's really taking this on so you know I'd like to claim the fame to it but no it's really our assistant city manager that makes sense
thank you so much no more questions thank you thank you any further up I have a follow-up question. So under accomplishments, I know the city manager's office, we organized an economic recovery task force. And I know for future goals, we're looking at continuing that strategy of how we can recover and develop. And I was wondering, are we going to continue to, in some form or another, continue these economic recovery task force meetings with stakeholders?
Yes. And I would just make a comment.
In the draft budget, if Council sees an objective or a goal that you would like to see us continue
on, you're more than welcome to make an adjustment.
But yes, we are, going back to your comment, Mayor, that yes, we will continue that.
It's just a different type of phase that we are working towards business recovery. All right. Thank you. Okay.
Moving on to the city clerk's budget. City clerk's budget for fiscal year 22-23 is $720,000 with 4.5 FTEs. that that's an increase because we're expecting uh it's about a two hundred thousand dollars that costs when we have elections so that's the increase so every other year you're going to
see an increase in their budget because of the elections there is no significant changes to 22
23 and major accomplishments in 21 22 is implemented and streamlined the agenda process moving from paper format to digital format to improve effectiveness and efficiency and reduce paper product. Working with Consultant National Demographics Corporation implemented the 2021 redistricting map as directed by City Council and improved the efficiency of conducting council meetings via Zoom platform and incorporate a hybrid form of meetings to promote public participation. Goals and objectives for fiscal year 22-23 include prepare, plan, and implement the general municipality election in November of 2022
to fill council seats, a city clerk, a city treasurer seat, and possible ballot measures,
research cost effectiveness, and the need for a fair political practices commission online reporting system to improve efficiency and research cost effectiveness for implementation of a California public records request tracking system to promote transparency and improve
efficiency and response time.
And continuous effort working toward identifying and improving processes, procedures, and implementing
guidelines for working toward going green.
Any questions?
Thank you, Ms. Garcia. Council members? Okay. Thank you.
Okay. Moving on to the city treasurer's budget. The city treasurer's budget is $30,800
with one FTE.
And there was no significant changes to the budget.
Any questions? Hearing none. Continue, please.
City attorney. There is no FTE since city attorney. its contracted services, and their budget went up to $688,000. And there is no significant financial changes to $22,000 or $23,000.
Any questions on that one?
Colleagues? Hearing none, continue, please. Management services, my department.
My department went up.
The proposed budget for next fiscal year is $6.3 million with a proposed addition of one person for a total of 21.5 FTEs.
The Data Processing Division, Division 1404,
has been renamed to Information Technology.
Beginning in fiscal year 22-23,
the division will be comprised of both city staff and contracted staff. There are three factors driving this approach.
the city's need to maintain control of its data for security purposes the cost effectiveness of contracting some of the services and the desire for an IT
division to respond as quick quickly as possible to rapidly changing business
needs we anticipate this approach to be the most appropriate for the city of
Monterey Park another significant financial change is that the
The communication and duplication division, which used to be 1408, has been dissolved.
The FTEs, services, and services were moved to divisions 1404, 1406, and 1407.
IT division 1404 is now responsible for communications, including landline, telephones, data cabling, and cellular phones.
in the Senate.
Central Support Services Division 1407 is now responsible for the mailroom coordination and its equipment. Some major accomplishments in fiscal year 21-22 include the implementation of the Tyler Muniz Payroll Application and the Financial Data Transparency Tool. Issued a sales tax revenue bond series 2021 for street resurfacing. Upgraded all city infrastructure switches and virtual
machine servers, implemented a robust on-site backup system and Veeam cloud storage with
ransomware and protection, and implemented a new version of Tyler cashiering to streamline
cash receipt process.
Some goals and objectives for next fiscal year include to remove all desktops and upgrade
firewalls that will have reached end-of-life support, upgrade city-wide internet from
300 MPS to one GPS.
Issue a request for proposal for the new city's new independent auditors and continue
implementing all goals identified in the city of Monterey
Park's 2024 five-year consolidated plan.
And I'm here for
questions. Thank you very much. Colleagues? Miss you, you have a question?
Yeah, I have a question about the same department budget summary, the expenditure by program, which is I2, I think on page I2.
My first question is the community, third line community housing assistant.
It used to project only $1 million, but then it actually happened in 2020 to 2021 as $2 million.
So it's actually $1 million above what we budgeted. So do you know the reason why? Yes, I do.
That is we granted awards or their grants to different businesses to help them during the pandemic. We were helping them pay for their rent.
Oh, okay. And another question would be for the – another question would be you mentioned that you remove all the desktop and upgrade firewall. So are you replacing with laptops?
No. If it's a desktop, it's a desktop.
And then if some people have laptops, some of those are being replaced so that we have the software that we need for our firewalls to network.
Oh, okay.
Because when you say remove all desktops, so is that?
Let me have my IT manager answer that.
Stanley Arden will be coming up to answer.
Yeah, when we refer to switching out or replacing all of our end-of-life support, we're talking about basically a one-to-one. So if we remove a computer that's end-of-life, we upgrade it with something newer, but it's still going to be a desktop. And that goes the same for our firewalls.
I see. So you just said end-of-life, remove them, right? But replacing with the same thing.
Yes, just newer technology, yes. Okay.
Okay.
I think I have let me see
another question is that for the revenue collections actually under the expenditure program same page I2, under the revenue collections that you guys projected usually like half a million but then for
2022 and to 2023 we budgeted
a million dollars, which is double, almost double of what we had before. So if we actually increase that much on revenue collections,
do we collect more than we spend?
So we moved the funding from Division 1408,
and we split it between 1407 and 1406.
six. So a lot of that has to do if you, it has services, so that's probably electricity
and other items that we pay for the city that's been added to the revenue collection division.
Okay, I see. Thank you. No more questions. Thank you.
Thank you, Ms. Yu. Mr. Chan.
Okay, thank you.
And, yeah, on page I2, the data processing is projected to close to $1.9 million. So there's a big jump.
So is it the implementation of the TIDAR program for that?
A few things are happening there.
We've added in fiscal year 21-22, we added an IT tech that we added just for one month or two months. I think it was for the quarter. So you'll see a bigger jump for that salary in 22-23. On top of that, we're asking for another position for 22-23, so that's going to add. We've also moved the Tyler Muniz project, the ongoing costs for maintaining the system. We've moved it into operations now. And that also, I believe, includes ARPA funds that we have assigned there to one of the items, I believe, is the replacement. It's some of the operational items that we're going to use with ARPA funds.
So how's the Tyler program doing? Is it efficiently? And most of the staff know how to do it. And I know it's a pain to switch from a system to a new system.
And so how's it going now?
We still have a little few tweaks to do, but it's great. It's very transparent.
everybody now the whole city can see in real time what's happening and even the public can we have that transparency module that they can see that actually it's every week Tyler uploads our revenues and our expenditures weekly so it's a very transparent system that also connects
everything together.
So all your payroll connects
to your budget.
Your budget connects to all of your GL accounts and all of the purchases. So everything talks to
each other.
And then on the revenue collection area,
are we still subcontracting a company
to do like those
business license recuperation or
going after the non-compliance, that kind of things?
Yes, we're contracted with HDL to do our business license. And they also, in fact, we're going to have a meeting with them to do audits to make sure that the businesses that are in the city are, in fact, have business licenses. So, yeah, we do contract with them.
Okay, and we do have some bad experience before with another company
because they send out not polite letters and so the business and residents are not happy with that
so hopefully we have more marketing finesse in there instead of so blunt as the that you owe text
to the city that kind of languages i hope you uh the company will work with us and provide better
service we've been meeting with them often so we'll make sure and we have to review the letters
before they go out.
Okay, that's good, that's good.
And then on page I-13, on the surface,
there is a big jump to $248.
Can you tell us a little bit about it?
Yeah, we moved all of the services and supplies,
all of the budget. We moved the budget from $1408 because we dissolved it.
we moved half of it into 1406 and the other half into 1407.
And that probably, if I remember,
I remember we had electricity that was being charged, so we moved it to some of the other departments so that we could continue to pay for that service, and we still had the funding for it.
I see.
Okay, so also in this, I think similar situation on I-15,
the program 1407 services also has a big increase
it's because we moved the money over
kind of like the line item exchange so that's happening okay
so how's the GO-MBK is it doing fine or how does it in your last page on I-16 on the program measurements. I can see that a jump from 2020 to 2021 year and then 2021-2022 is a steady increase. But then you projected pretty much the same on the GO-MPK usage. So I think that's a great app and actually other cities, they ask me about it and I show them and I do those
sidewalk cracks potholes trees or anything like that and I think it's pretty good and some of the cities are so like the program that I ask them to talk to city manager and so forth and I don't know if they did but it's a great program but is there any way that we can promote it because, like, especially the sidewalk, when I see some cracks or some, you know, an even sidewalk because it's so dangerous and it creates liabilities to the city, I always take pictures and send it in. But if we have more residents into this program and then we have more eyes on the street, and I think this is a great program. We may, if we can market it better and have more uses, I think it's good.
So I hope you can put that in and put in some marketing into it so that we have more people to use it.
Of course, that will fall under the city manager's responsibility instead of other departments. So there's another burden for you.
And my last question is, you say we're going to change the auditor.
every five years
we put out an RFP it could be the same auditing firm just a different partner
we can keep everything going
because then we get too comfortable with the auditors so you always want to keep refreshing
okay so this is our policy to switch or something like that
I don't know if it's our policy but it's our practice yes
okay alright thank you
Thank you, Mr. Chairman. Mr. Liang?
Yeah, just a follow-up question for the IT section. On the replacement of the computers one-for-one, we're not under a purchase agreement. We're doing leasing from a computer company for a period of time, and then we're actually purchasing?
Yes.
Okay, and then when you say one-for-one, is that always a hardware-software switch-out, or are there times when you're installing a new operating system as an upgrade instead of switching out the entire computer?
It depends on the situation. I mean, it depends on the hardware, how old it is. Sometimes we just do OS upgrades. We don't have to necessarily do a hardware upgrade if the hardware is still good. So it's treated on an individual basis based on our situation and what security problems we might have.
Okay, so then on this particular budget ask and these replacements, is it a one for one in that it's gotten to the point where all the PCs are it's time for new ones or Is there some kind of evaluation to say okay? Well, we can use the hard drive on here We could use the motherboard on here or is it just a swap out in this case?
The computers are fairly fairly old and OS wise is a security issue and hardware wise so it's a whole thing and then what happens to the the
Old stock if you will the one that gets moved out. Does that just get thrown away or is it surplus? normally with surplus we just get rid of it you just keep it as a backup or no it goes to surplus
and it gets goes to auction they the IT division uh wipes out the the memory and then it goes to
our surplus and it gets sold in auction okay so it doesn't get thrown away I'm just I'm sure that you know that some of those things can be recycled I mean you know torn down and recycled so okay that that's it I just wanted to follow up on the technology question thank you thank you very much
Mr. Lang. I have a follow-up question and I want to thank Mr. Chan for bringing up the GoMPK app.
I use it myself frequently and I think it's a great tool for the city.
But I'd like to ask, are there any plans to add language as a way to increase accessibility for residents?
And I know I've brought up in the past because we know that this is a multilingual community, and perhaps that might help increase usage of the app.
Well, I can take it on, or you can.
Are you referring for the app itself to have a different language?
Yes, the app itself, yes.
We can definitely look into that. Yes.
I think it's important because, again, even I sometimes, when I've spoken to neighbors, residents about, hey, we have this great app, but some people may not even be aware of it. And now, Mark, that's maybe a marketing question, but I think it also might have to do with language accessibility.
We can definitely look into that and make those. City Attorney- The next department is HR and Risk Management. Their budget for next fiscal year, proposed budget for next fiscal year is $1.5 million with six FTEs. They have no significant changes to the fiscal year. Their major changes are the accomplishments include continued to monitor practice procedures and policies related to the COVID-19 pandemic, solicited and evaluated proposals for the membership in a joint power
authority risk sharing pool, and hired 30 full-time and 33 part-time employees.
Their goals and objectives for fiscal year 22-23 include citywide classification and compensation
study transition risk sharing pool membership and this concludes for HR
risk management department. Thank you. Questions? Mr. Yu. Hi. Actually I just have a
quick question about also the expenditure. It's increased to me is the
the position, full-time position has stayed the same,
but then it seems like increased from 1.1 to 1.5. Almost 1.5. So is that the reason just to pay raise, or how does that work?
If you look at page J3, it went up, internal service charges went up by 170,000.
Yeah, but then on your presentation,
on your presentation, On page 40, I mean, on the presentation.
That could be because HR is funded with not just general fund. And when I did the presentation, it only showed.
It's in the HR section.
First slide? 43. 43.
Okay, what was the question again?
I think she was asking if you look at the numbers, the actual 1.039, and then now we're at 1.4, almost 1.5, I think.
She wanted to know what the reason was for that.
1.6.
Well, we did add a position in, I believe, in 22-23.
23. But then it said six people. And the difference between the are you asking about the difference between the original and the projected for 21-22?
I think yeah. So that's a $50,000 difference and that is we came to council at mid-year and asked for $50,000 for the classification and rate study. And so that's the difference for the projected because that includes the classification and rate study.
but it's more than 50,000 the 170 1.22 to 1.4 so then you're comparing the 1.2 to
the 1.4 and that is related to internal service funds oh
so you have almost 400 compared to the original budgeted 2020 okay so you can see the trend from
1 million to almost 1.5 but you don't increase any positions there is no set because of increase
of internal services fund so what may i know what is that related to so internal so internal services
fund that would be technology, shop, workers compensation, general liability, separation
benefits and OPEP.
Okay, thank you.
Thank you Mr. Chan.
Yeah maybe I can.
Let's look at page J4.
Program 1801. I think what Council Member Yu is referring to is this.
Now in the bottom of the chart is the same full-time employee equivalent, 3.5 employees, but the salary is increased to $476,000 from 359 budget last year with the same number of employees.
but the salaries and benefits increase like over about $120,000.
So I think that's her question.
So we had some ARPA money in last year's budget to cover the HR manager.
That money is no longer there. The HR manager is fully funded with general fund and other internal service fund revenues. So that's one of the differences. Also, the MOUs for those individuals is still active. Their bargaining unit MOUs is still active, and they are anticipating another increase in their pay.
So that's an increase in the salary?
Yes.
Okay. Yes, I think that's her question. is that. And then on the
of course the human resources and the risk management
that I can see is to provide safe environment for all the workers.
And so I think we have continued what the
seminars or workshops
and I think that's still going on, right? Every two years, I think we have the study,
so the workshop that's talked about the working environment and how to deal with each other
and how to report any harassment or anything. So that is still going on.
Our HR director is present and can speak on that.
Here she comes.
While Christine comes up to the mic, I will also make a note. When you're looking at positions, salaries and benefits, you may see the same amount
of employees, but the fund could be Lor. Reason being is we always fund it for the full position, let's say six, but we actually
may be Lor because the vacancy, because that position may not have been filled during that year. But then the following year, it may show it may be higher because we're filling that position.
So just make note between the actual and projected and budget, there's a big difference between the two at times at various different places. Christine?
Good evening, Honorable Counsel.
So yes, for training for anti-harassment training,
that is required by the state every two years.
We did budget for it this past year in 21-22, and the training was conducted for all employees. The only other required training for that in this upcoming year in 22-23 is for any new hires that come on board, and they have to have that type of training within the first six months. So we didn't, there's probably a little bit of reduction in our training budget for that because we don't have to have it in 22-23. The next time we have to have it again is in 23-24.
Right. It's a biannual thing. Yes. Right. And then I would like to ask,
is any throughout last year, the fiscal year, 12 months,
do we have any case that's pending or any complaints or anything at all?
uh not in 21 22 we haven't received any we probably there's some complaints that have happened but they might not be related to anti-harassment i see okay so yeah so i think
uh we we okay yes in that area to provide the safe environment for everyone working in here. So I think that's good.
Thank you so much. And then on J5, in the middle of the page, occupational health, and of
course, it's fitness for everyone. It's important. It's good because that will reduce injury and the city will save
a lot of liability money. But how do you go by with
what do you recommend to people today? do the staff follow you know the fitness what kind of programs do you provide for them to to to be fit enough to do the job or to their own health?
So the occupational health item is really related to OSHA and there are programs already set up in different departments for fitness for health and fitness so fire department and police department have their own budgets to accommodate the physical fitness aspect that are typically within the mous as well then what about the regular staff
like because i i know that you you know sit the whole day you know just looking at the computer
the repetitive of the job may you know get some injury as well so do we have any ways to address
those? So my understanding is we used to have a safety committee that would help evaluate citywide issues and ideas similar to what you're suggesting and I think because we've had turnover in the HR department our goal is to hopefully re-look at re-implementing having a safety committee so that way we can kind of address those types of things that may come up.
Yeah, and I'm happy to see that I know that the city manager and the secretary, Diana Wong,
they have the movable desk so that they can, it's too tired to sit the whole day,
then they can stand up. And I think those are the good stuff. And are we putting those to the other?
So I believe if you look in a lot of the different departments,
majority of every employee that is at a desk has the ability to elevate their desk
so that they can sit the sit-stand desks we have them available or we've implemented those in a lot
of the places in a lot of our desktop areas where employees are sitting yes yeah that's that's good
And I know that before, the library used to have a walk-a-thon to raise funds, 5K runs, 10K runs. The city holds that too. And that will add to the health of all the employees. And since we have the park, and that's the track outside, and you can walk around or run around in the park
and go up to the hill on the sidewalk to Harding,
and that's good exercise.
And if you can maybe put in some competition, like if you walk so many miles a week, and so there may be some prize or something like that, I think that may add to the fitness of all the employees because I think health is most important, especially now that the pandemic, although we've seen, well, I cannot say it's the end of it, but I still have some issues. But I think the general health of all our staff is important so that we can come up with some program or some initiatives or some prizes or some awards. I think that may be good for everyone.
Yeah, and let me see. And I can see the liability claims on J8, which has been reduced over the years from 46 to 31 to 19. So I think that's good and keep on doing it. And pretty much the same on the women's compensation claims. it's like pretty much with last year 49 and now he's 47 so which is good and yeah I want to thank you for watching out for the city. Thank you. Thank you. Thank you Mr. Chan. Any other comments, questions? Okay hearing none. Thank you.
The next department is
I'm sorry, actually, yes, at the request of our colleagues, let's take a 15.
15?
Or what? How long do you all need? Five? Five? All three? Okay.
Okay. Okay.
We will take a 10-minute break, and we can be back at 8.55.
All right, thank you.
Jamie, you want to soldier something? I think I actually took a red.
Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you. Thank you.
Thank you.
Thank you. And that's what I like.
Okay, sorry, yeah. I'll watch it.
Yeah, yeah. Yeah, we'll see.
I've been putting- I've been- It's 7am today.
click on more elements. They want to do a press statement.
Like today, a lot of members have a press statement. They have a treat.
Again, I don't do it for a lot of
let someone in the middle. No one may have a number of neat to hold them on a couple of weeks. So that's not what I said. Huh? Oh, yeah. Oh, yeah. Oh, yeah.
Thank you.
I think I'm a little bit I thought that you would I do
and then I was just like what? I don't know I'll tell them
I don't know
Thank you.
Thank you.
Oh, I didn't know I put my phone on.
I don't just sign it.
Thank you.
We're all going to be right. Right, right. That's where we go from.
Thank you.
Okay, looking at the time. Members, staff, if we can make our way back.
We can go to midnight.
Oh, okay.
Right.
Okay, very good.
Okay, are we ready?
Thank you very much. Let's resume session again.
Okay.
Continue, please.
The next department is community development. Total proposed budget for 2022-23 is $2.3 million.
Total FTEs is 11.
There is no significant changes to fiscal year 2022-23. Their major accomplishments include the planning division oversaw the general plan amendment to update the housing sixth cycle 21-29 and safety elements and added an environmental justice element. Continued the implementation of the electronic plan review and plan submittal for all planning-related applications.
Implemented streamlined planning processes, which were approved as part of the Monterey Park Business Recovery Program
to help businesses that were hardest hit by the COVID-19 pandemic, process planning entitlements for a new multifamily residential project, expansion of an existing convenience store,
and mixed-use project involving a commercial space in residential units and self-storage facility.
And another accomplishment is the building division was able to go digital with all applications,
reducing paper storage and cost of scanning physical documents. The division implemented upgrades to the current permitting management software,
Accela, allowing applicants to submit permit application through an online portal.
With this implementation, it will assist expediting the process for the applicant to obtain building permits.
some goals and objectives for 22-23 include as a follow-up to the adopt to the adopted land use
element and housing element of the general plan commence with an update to the zoning code to
create consistency amongst the general plan land element the city's zoning ordinance and the zoning
map, conduct a series of updates to the Monterey Park Municipal Code to correct inconsistencies
and to implement recent changes to state law as they pertain to wireless telecommunications
facilities, accessory dwelling units, and density bonus, among others. work collaboratively with the city economic development division to help existing businesses
thrive streamline the approval of new businesses and identify new development opportunities with
interested developers another goal is planning division will spearhead a community-wide campaign
called going green which will involve all city departments and will be rooted in the community
to develop and implement strategies which will help mitigate climate change
and adapt to climate change that is already occurring.
And another goal is implement ePlanSoft, a cloud-based electronic plan review software
which will allow all divisions to review development plans in real time
and assist the coordination between divisions.
This implementation will reduce plan review turnaround times in all divisions and expediting approvals.
And that concludes for community development.
Thank you very much. Questions?
I see Ms. Yu, you have your mic down.
Hi. I think also similar questions that come up to me on K2 or even on your presentations that now we see a big difference
on the expenditure from 1.3 to 2.29 has actually increased almost a million dollars.
Is that because of, I mean,
I saw that you increased two full-time positions, but then two full-time positions doesn't equip to a million-dollar increase. So is there any other reason why it's increased so much?
So the two positions that are now in 22-23, and we also previously some of the positions in building were not fully funded they were partially funded so they are now fully funded we're we're trying to build the community development division department so we're trying to fully fund all of the full-time positions so that also occurred
and then we have some additional services that were added if you go to
page K9. There are services that our community development director can speak about that have been added into the budget to ramp up planning and
building.
Any further questions with you? You're done? Thank you. Mr. Chan?
Yes, and I'm pretty happy that we have implemented
can take some proactive steps if like the staff can proactively call the business owner
or the applicant that hey you have some mistakes in your application or there's some little
things that was that was hindered the process and if we can take some proactive steps and address those issues and call them up and have them come in or do it online and make the change
and maybe it's some little things that hold up the process. So I think that may be something
to consider that we do the proactive steps. And another thing is on there's some increase
and I believe that because of the combining the planning and the building safety together and so this the budget increases that I can can see and and then on the other one that I want to
point out is the K7 the major accomplishments is it because I know that housing is coming will be with us, especially affordable housing, will be with us in the next decade or two. It's not just a short-term approach,
but we have to do it in a long-term approach. So it's good that we have the foresight
to have more affordable housing or new multifamily residence project in the city.
But as for how to ask the developers or the property owners to work with the city,
and that's an issue, I think, because we do have some property owners
that sit on their property and doing nothing for years or even decades. And maybe we can come up with some plans with carrot and stick together and try to induce them to work harder to develop all those vacant lots or underutilized lots because we do have a lot of them. And so since we have already made the zoning changes to mixed use, like along Gavi and Port of Atlantic and Garfield, and, you know, so we need to come up with some ideas how to make it do something for the city instead of just growing weeds in the poverty. So how can we do it? So, I mean, it's just some suggestions that I would like to ask the staff or the city manager to think about and take it to action.
to have more family housings regardless of market price or affordable.
So I think we need that. Thank you. Thank you.
Thank you. Mr. Lan. Yeah, I just have one question on page K10 when we're looking at funding sources by type. Enterprise fund, we've, you know, 58, 70, 70, and then now projected at 271,000. Can you just explain that?
Again, that's we in for planning for that sorry for the building division those positions were not fully funded before so we've increased the funding and we've charged for the technology and all of the items so it's I don't know the details of why increase it is but it's because we increase the revenue therefore we the service the charges were increased.
And then now that that division is fully funded, right?
Yes, the full-time positions in that division are fully funded, yes.
Okay, thank you. Thank you. Ms. Yu, yes? A follow-up question?
Yeah, just actually last notes that I just asked our city manager that this department, Community Development Department, it was not on the last year budget, preliminary budget, because we don't have the department head, right? So it groups under the public works for last year. And so this time, you know, it shows up as a department. So city manager, anything to add to it?
Mayor? Yes, Mr. Bo. You're correct, Council Member U. Last year, the planning and building divisions were underneath public works. and we realized that the wrapping up of development housing accessory dwelling units and just processing various different plans have been escalating so it was a good time for us to rebuild that department as I mentioned before when we talked about this earlier in the budget session so we're in the process of rebuilding that department as as you can see it is separated now back to its own department and it is nearly fully funded. I think there's some positions that we haven't
recruited for yet but it is funded. Thank you Mr. Boe. Thank you. Any more questions, comments?
Hearing none. Thank you. Proceed please. The next one is the library department. The library
department budget for next fiscal year is $3 million with total FTEs of 25. That is because
we brought back all our part-timers with ARPA money. The significant changes for the library
is effective fiscal year 22-23. Responsibility for the operations of the circulation division has moved under the technical services as senior librarian. The staff of the circular division have been cross-trained to work across the divisions of the library and are assigned
to the three public-facing programs, reference
services, literacy, and children's services. Some major accomplishments for 21-22 include implemented a weekly outdoor pop-up library at Barnes Park where patrons could register and or renew their library card, check out books, access free Wi-Fi, and read newspapers in a comfortable outdoor seating area.
Presented off-site outreach library services including check out, story times, crafting
meetups, and senior fitness sessions at various sites in Monterey Park including Barnes Park,
Langley Senior Center and outside the library to meet the needs of the
community during library closure offered mobile Wi-Fi hotspots and Chrome
books for the checkout to close the digital divide by providing residents
with access to technology and high-speed Internet expanded the library's digital
collection by adding access to online learning platforms for test preparation
career change, small business startup, and digital skill building to provide workforce development assistance and offered free digital access to more than 7,000 newspapers, magazines from over 120 countries in 60 different languages.
Some of the goals and objectives for 22-23 include create a three to five year strategic plan with input from residents, staff, stakeholders that identifies community priorities, needs, sets strategic areas of focus, as well as specific goals, actions to ensure the library's collections, programs, and services continue to meet the needs of all residents.
restore public service hours at the library to 40 hours per week, bring back all in-person programming including computer classes, senior programs, movie screenings, educational lectures, and homework help, and improve Wi-Fi access within the library for the public by upgrading hardware.
I have one correction for the library section of the budget book. It's on page.
On page 9N, under actual 2021, the number reads 1,1781, and it should be 1,178.
That will be corrected with the budget that comes back on June 15th. And that concludes the library department.
Matthew, question?
Just a very simple question. I'm interested to know how many mobile, Wi-Fi hotspot and Chromebooks available to check
out.
Is there any prerequisites or any requirement or income requirements that need it?
good evening mayor and city council thank you for the question uh the library currently has 25
mobile wi-fi hot spots for checkout by the community um they are available to all uh card
holders so there is no income requirement to use those those were funded through the california
State Library, so at no cost to the city.
And how about Chromebooks, also 25?
Chromebooks, I'm looking at my staff. Do we know how many Chromebooks we have off the top of my head? 8 to 11.
Yeah, I think we've got about 11 Chromebooks.
Okay, and then how long can they borrow?
The Chromebooks check out for three weeks. Three weeks, and Hotspot also?
Hotspots check out for two weeks.
Two weeks, okay, thank you. Thank you. Thank you.
Thank you, Ms. Yu. Mr. Chan?
Thank you, Mayor.
I want to ask Librarian Diana, the APA budget of $426,000, that's on page N5.
can you talk about you know what kind of things will be involved included or
included in these ARPA funds? The majority of the ARPA funds for the
library division are to fund our part-time staffing. Okay thank you. That's
And then on page N6, on the second line, services, I see an increase from 100-something to 234,000.
So what does that involve?
For this line, we moved some of the funding for 6004. If you saw the slide for significant changes, we've absorbed some of those contracts into some of the various other divisions of the library. That also includes the funding for the strategic plan that's included in the 22-23 objectives.
I see. Okay. And then on the capital out late, what's that? $131,000?
That includes some improvements to the story time room that we're making to allow us to serve the needs of the very big groups that we have in there.
It also includes Wi-Fi upgrades, and then it has funding for some other library services.
So the children's section is fully operational now?
It is, starting in just a couple weeks. In June, we're going to bring back story times indoors. As you know, we've been having them outside in Barnes Park during the pandemic, but we realize it's getting warmer, and so we're going to bring those back indoors.
We've got a storytime room right now that needs a little bit of expanding, so we're going to try to make some changes in there that makes it a little bit larger that will allow us to accommodate these large groups.
Okay. Then what about the literacy programs, the citizens class? Are they coming back as well?
Yes, they are. So during the pandemic, those were conducted via Zoom. Starting in April, we brought those back in person. So they're now running in a hybrid format. So we've got teachers and then the students who want to come in person are in the classroom.
And we were able to purchase some technology during the pandemic that allows us to teach those in a hybrid manner.
So the students that want to remain at home are able to also attend those classes.
Good, good.
And then what about that book mobile that you have that already in function?
So how does it work?
Does people like it or what?
Well, I think you're mentioning the pop-up services that we added during the pandemic.
Our staff worked really hard to basically make all of the services available in the library available outdoors so that we could provide those in a safe way. And so what we've been doing is we've been doing pop-up services. We did them on Tuesdays and Saturdays in the park where we've brought out our computers.
We've brought out Wi-Fi hotspots. We've brought out books that people can check out.
They can make library cards, access all of those services.
We were also providing them outside the library doors during the closure for Omicron.
If we do get an outreach vehicle through grant funding or through fundraising, then we would be able to add a bookmobile service.
So those cards, you have to move it manually? Yes. Oh, I see.
I see.
So that's why it's restricted to Bounce Park. Right. That's right.
Yeah.
So hopefully we have those bookmobiles coming soon.
Yeah, it's definitely something that we're looking at grant funding to be able to supply.
Okay, and let me see.
Yeah, I think I'm, oh, the, well, that's internal service that I mark.
I think that's my questions. Thank you.
Thank you, Mr. Chan. Ms. Yu, you have your mic down again? Yeah, I have a quick question. It's on N12, the program measurement. you add a section saying that amounts saved by borrowing instead of purchasing
is projected to be 1.2 million so i wanted to to ask you you don't have it on it for last year so i wanted to see why you added on this year and show us how much we can save right so we have
those numbers going back to 2020 2021 you'll see they increase significantly each year obviously the library is getting a whole lot busier because the pandemic is easing but we wanted to include that to show how cost effective the library is we're saving we're projected to save our residents 1.2 million dollars and that's just in the serve the borrowing services so that doesn't include anything like free classes, story times, Wi-Fi, hotspots, Chromebooks, computer usage, anything
like that. So it's a good investment in the community. Yeah, great. Thank you so much. Thank
you. Yes, Mr. Chan. Yeah, one additional question about the French room. Is it also open for the
public usage? Yes, it is. So all they need to do
is to apply and see if it's available and then they can use it for whatever purpose
that is. Because I know that before the French room is
used extensively and especially in the weekends always have some programs. So good that it's open back to normal and but what's the hours in the weekends now? Weekend hours are Saturday 10 a.m. to 5 p.m. starting in June. Oh okay so do we have any applicants for the friends rooms usage? You know
I don't think we've had any public groups use it yet all the information is available on the website and so the application and the policy is available but it is open to any non-profit group that wants to hold an open meeting.
So the requirements are the same as before. That's right. Right. Okay. Thank you. Looking forward to those new books and movies or presentations, exhibitions. That was great. Thank you. And I hope the residents know what's about it and put in some programs together and we can see each other in the library. Thank you.
Thank you, Mr. Chan. Mr. Liang.
just really quickly the Bruggenmeyer library is definitely a jewel of the city here in Monterey Park and I just want to express my thanks and gratitude to Diana as well as the library staff for keeping it a jewel of our city and also being really forward-thinking you know we've been through Peter and I have been through I think three librarians since we were elected and you know we can see the progress going on as time progresses and you guys have really been doing some great innovative things so i just want to commend you for that so thank you guys thank you mr liang and
i also want to repeat those sentiments i think that during a pandemic many of our residents have been very i think relieved that the library has continued to be a resource for them and i also
want to just add that i'm pleased to see that for your future goals objectives that you are looking
to restore library service hours to 40 hours per week, because I know that's something that's for a while been a concern and a request from many residents. So I'm glad to see that being implemented. Okay. Any more further questions, comments? Okay, hearing none, thank you so much. Thank you. Okay, moving on.
The next department is Recreation and Community Services. Their budget for, their proposed budget for 22-23 is $3.5 million. Their FTEs are 36.75.
Effective fiscal year 2223, the media production and communications program is no,
Division 6509, is no longer under the Recreation and Community Services Department.
Instead, it's assigned to the city manager's department.
major accomplishments includes installed a new pool heating system at the George Elder
Pool, updated and repaired the Cascades
waterfall by applying new epoxy paint and
replacing lead lighting, expanded the Langley Fitness
Center space to 1,100 square feet
and added 15 new commercial grade pieces of fitness
equipment, developed and implemented the first annual pickleball tournament at Barnes Park,
which hosted over 100 participants from throughout California, and collaborated with the Brigham
Meyer Library to host a massive Monster Mash event and provide a read and write program
that encourages youth to read and earn play days, carnival ride tickets. Goals and objectives for 22-23 include improved community beautification by collaborating with local artists to add art pieces at city facilities and in parks.
Develop and implement a park bench picnic table and bike rack sponsorship program to help replace old park items with new products made of recycled materials.
and collaborate with the Public Works Department to install lead underwater pool lights and overhead deck lights at George Elder Pool to improve visibility and energy efficiency
and increase evening time participation at Langley Center through expanded hours and available fitness opportunities for active older adults
and develop a meditation, mediation, and relaxation space in the daycare program
where the youth can participate in quiet activities that help promote peace, balance, and reduce anxiety.
And that concludes the Rec and Communication Services Department.
Thank you very much. Council members, questions, comments? Mr. Chan. Thank you.
In the Recreation and Community Service Department is a very important service to the residents. And I want to thank the department staff, Robert Aguirre, you know, great job, and especially Lanny Center.
You know, you opened the fitness center expansion to a weightlifting thing. And actually today, after I finished reading all these books and all those numbers and make remarks,
and I was so tired, so I actually went to do some weightlifting in the exercise room for just half an hour
because I have to go back and take a shower and prepare to come over. But that was good.
But then I told the city manager,
one of the treadmill is down and it's not working and it has a sign that is out of order
but it's been out of order for some time so so if you need a new machine or whatever then please replace it or or fix it you know because out of order for such a long time is not good and i want
to you have the goals and I want to ask in here is that on the elder park pool and you want underwater pool lights and overhead back lights but I think we don't have do we do we use it in the evenings or at night? Okay. Director Robert. Good evening, Mayor, City Council members.
Good question. Yes, we use that pool from early in the morning till late at night. That
fully functioning pool, just as Barnes used to be, the pool is open 6 a.m. and we have programs going all the way till 9 p.m. So those lights, the underwater lights are definitely a safety,
So you want those for safety in the evening so that you know lifeguards can see the swimmers in the water.
Okay and I noticed that the lines the black lines underneath the pool.
Yes. That a lot of them is.
Starting to fade and that's something that staff is already looking into to hopefully address at the end of this summer. their period between the end of summer and school starting to get that going so we can get those painted before
Mark Keppel comes back into the pool. Okay, good, good. And I use the pool as well. Well, then for you as well. Right. And, yeah, health is a very important thing, so I would like to see all the staff and residents
utilize fully on the services that we have. Even we have, what, 13, 14 parks around the city. Just walk around the park is good exercise. So you don't have to do heavy weightlifting or long-distance swimming, but just walking around is good enough for your health.
And then please don't give up on the Barnes Park pool as yet. And I know it's a lot of money, but let's think of some way to wreck the racket.
And I know it's a lot of money, but let's don't give up hope because the 50-meters Olympic-sized pool is not that many in the area.
And so since it's broken and it's kind of like beyond repair at this time, but let's see what we can do. And I've been working with the assembly persons and some legislative persons and see what we can do about funding. But please don't give up hope on that yet. And if we really cannot do anything on the pool, well, change it to something else. Because I really don't like to see it stay idle, just fan off, and the whole place is, you know, not doing anything.
Yeah, so see, if we really cannot do the pool, then what can we do?
So I think that's another thing.
And then as for the numbers concerned, maybe on page 02, the facilities supervision, it's a big jump to $853,000.
dollars so can you you know tell us a little bit more about that increase yeah so all of the
well the major increases in in my budget it's going to be all with uh us going back to original staffing levels so it's bringing back all of our part-time and so those are all going to be arpa funding uh bringing back our staffing level so but bringing back all the part-timers that weren't funded during the pandemic uh it's bringing back all those staff so that we can bring back all of
the programming and facilities that everyone enjoys.
Okay, good.
And then, yeah, the service also, like the recreation facilities, there's also some jumps on the services. That's from, well, it's, no, that's okay. That's all right. That's pretty much the same as last year.
And it's good that we can see a lot of ARPA funds to be used.
Oh, can you tell us, like, what kind of improvements or what kind of facilities improvements that we've been using those ARPA funds for?
The ARPA funds for the Recreation Department are all for part-time staff. Oh, I see.
there is some CIP projects that will just four parks that we will discuss
later okay good because I can see the restrooms in the different parks they're
pretty outdated and in the ventilation and the facility is all so maybe we can
come up with some ideas how to get some money to update it or even rebuild it I I know that some restrooms are kind of like really old.
be some of the the items that Martha will discuss in the CIP projects or
proposed projects for the ARPA funds. Okay good like to see them. Because I agree we
do need some some playground upgrades. Okay and I know that the Lainey Center is
open on Saturdays as well. Saturday from 8 to 12, 8 to noon. 8 in the morning? 8 in
the morning to noon yes. Right right okay yeah and Memorial Monday will be
closed. Monday will be closed but the pool will be open. Right. So you can still get your exercise. So even on Memorial Day, Monday. The pool, yes. George Elder Pool will be open on Monday.
Langley Center will be closed. Right. Yeah. Okay. Okay. That's good. And I think just about it. Oh and can you talk a little bit on the Dow Arrive? how does it do last year because of the pandemic is any effect or you know some
so the dialectic continued to operate during the pandemic we focused on essential trips so trips
to the doctors or trips to get groceries so essential items so that the seniors could still
you know get get make it to their dialysis or to their medical appointments and so that's been the focus um we have now uh brought back the original services and so now we're we are seeing an uptick
in in utilization of the services um and all of our drivers have been extremely busy um getting
you know seniors out and out and about um so yeah definitely we've been operating all throughout the
pandemic um but it was just more focused on medical appointments okay thank you yeah
Thank you, Mr. Chan. Mr. Lange, okay.
I just want to echo the sentiments that Mr. Chan brought up regarding Barnes Park.
Again, I think that many of us have probably heard from the community about the significance of the pool at Barnes,
And I do want to reiterate that we should make every effort to restore the pool. And my question is, under the aquatics program, under the budget presentation presented to us,
I know the pool is currently in non-use, but I hope that we are also making sure that while it is in disuse,
that it does not further deteriorate and so I do hope that that we are at least making effort to do any maintenance that's necessary so that it does not
further deteriorate the pool. So yeah pool maintenance staff DILS does
maintain the facility and the pool so that the mechanical the mechanical parts
of the pool are still operational so yeah we the pool maintenance staff DILS
does address Barnes Park Pool as well as George Elder Pool and also the Cascades Waterfall.
Okay. Any further? Okay.
Hearing none, thank you so much for our presentation.
The next department is Public Works, and I do have one more last error to report.
On page P3, the Building Division and the Planning Division are no longer in the Public Works
Department. That will be removed from the final budget.
The Public Works Department budget for next fiscal year is $41.3 million with 74.25 FTEs. There are no significant changes to fiscal year 22-23.
Some of their accomplishments include Encanto and Cascades rehabilitation project,
completed street resurfacing and rehabilitation improvements at various locations, the traffic signal improvements, Garfian Graves, and completed Northeast Mainline Phase 1 and 3 to improve fire safety.
Some goals and objectives for fiscal year 22-23 include complete Phase 1 and 2
of the street bond resurfacing project,
the water meter replacement project
and water conservation initiatives
and improve pedestrian and vehicle safety. And that concludes Republic Works.
Thank you.
Questions?
Of course, take your time, members.
Mr. Chan?
Yeah, on the page P9, the debt service, I think that's the street bond. Am I correct on that? The $1 million?
That is correct.
And how's the bond thing going? So we have...
We made our first payment this month. It was interest only, about $600,000, I think it was, somewhere around there.
Do we have to pay what? Semi-annually?
It's semi-annually, yes.
I see, okay. And the bond money, the revenue, we received fully already?
The money sits with our fiscal agent. It's sitting with U.S. Bank. And as we come to council for new projects, we draw down from the fiscal agent, which is U.S. Bank.
So the bond money is already in place?
Yes.
Okay, good. Good. And then we will use it, you know, as needed?
Correct.
Okay. So how is the situation that I know that there's some street has been repaved and so forth around the city. So how's the progress on the?
Our interim public works director can speak on that. And here he comes.
Good evening, Mayor and Council. We're presently advertising some street resurfacing, so we're going to have bid openings this tomorrow and next week and we hope to put this on the City Council agenda for an award on June 15th so we are making progress and as soon as that work should all be completed about November December timeframe and at the same time we're advertising we're preparing our bidding package for the the next cycle I see
Okay, and then what about the sidewalk? Do we have any plans to improve any sidewalks or anything at all?
I'm on that one. I'm gonna have to get back with you councilmember. Okay
Okay, thank you
Mayor if I may yes, mr. Bo what when we took out the bond for the streets It was specifically to address the street issues that we continue to have As you remember, we were venturing down a pilot program of indicating some of the major trip hazards that we have around the city. We did a pilot program on Atlantic Boulevard. We also funded a program to enhance that continually. That's in this budget coming up. We anticipate that we will have a good inventory of sidewalks that need to be replaced. At that time, we'll come back and ask for additional funding for sidewalks. But at this time, the street bond is strictly for the streets.
Okay. Thank you. And then I would like to, well, I've been asked this before, is the back alleys.
we do have quite some back alleys but they are kind of like
neglected and a lot of potholes it's not in good condition
yes I've driven some of the alleys in the city and I concur with you they do need some care and attention and we will be doing an inventory of those alleys so that we can get a good sense of the dollar amount of cost to do the repairs.
And the street bond does not cover the back alleys, isn't it?
It initially didn't. But judging by what Public Works is doing, doing some really good engineering, that there's a good chance that we might be addressing a good portion of the alleys. But we do not have any further information about the alleys until we get through the first phase.
Okay, thank you, because please put the back alleys into the radar at least. It's on the radar.
Yeah, because it's really long time, you know, not doing anything. So it will go and deteriorate more, and the cost to fix it is even more as time goes on. And I have some question on page P36. that's the water administration program number 4220 it's kind of like across the board increase in salary services commodities internal services and so forth and so it's kind of like compared to 2020-21 it's kind of like three times and double on the 21-22. So can you explain the big increase?
So part of that is under salary and benefits, there's an additional FTE that's being added.
What is that?
Full-time employees?
Yeah, full-time equivalent employees.
I see, okay. And so that accounts for the salary and benefit increase.
For services, there might have been some additional charges or services that they're anticipating in the water.
And the other one would be...
Like the services? What is the services then?
Do you know what they're... Not the internal service.
No, not internal services. It's just regular services. There might be anticipating to purchase some consulting services. I don't have the detail on it.
We would have to get back to you to find out what additional services they've added. But this would be, it could be, they're needing to have some consultants coming in.
They might be doing some studies.
they might be
you know different items
that maybe there's some new laws that are coming in they're going to have to prepare for so that's
what falls under this category
I see okay thank you for that and then on the next page 37
on the
funding sources by type
chart the enterprise fund
is also a big increase to $661,000. So why is that a big jump?
So if you look at page P36 and P37,
the 661 that this division needs is coming,
the 661 is coming from enterprise funds.
Water is enterprise funds.
It's the same dollar amount. it's the cost of this division.
No, but this is the sauce. That's what's funding that department. Yes.
But, okay, then the money comes from where?
Water. Okay, so let me help. It's when the residents, everybody that signs up for water, they have to pay a water bill. Right. That fund and that cost directly pays for the water department and all the functions within the water department.
So that means we are paying a lot more water bill?
No, your water bill is still the same. It hasn't went up.
But then how come the money comes up? So where the money comes from?
We will be bringing it we are looking at possibly doing a prop 218 our Expenditures and enterprise have increased and we are and we have a lot of infrastructure that needs repair So possibly in the next fiscal year will be can bring to council for consideration to to do a prop 218
I see so that's calculated in here in the next year's budget
we are no not prop 218 no we are we are using some of our reserves from our water fund to cover all
these costs but we are not talking about the cost this is the funding source right but the funding
source is the 661 that's going to cover the 661 cost.
Right. My question is where does that 661...
to our residents, we're using our reserves until we can come back to Council and discuss
Prop 218. And that's the water reserve funds. It's nothing to do with the general funds or anything. That's a particular water fund.
Specifically for water fund, yes.
Okay. Okay.
Your internal services are saying. And then on the page P40, water production on the commodities, the third line, also increased $246,000 in the coming year budget. So can you talk a little bit about it? What is those commodities? That is an increase in cost on the chemicals. Oh, I see. Wow, that big jump.
It's not just the cost for the chemicals, but it's also the material that you use for your carbon change out. As you can remember, the Water Department needs to continue to come to the Council to request additional amendment to the budget because the increased cost of the carbon change out, which reaches, it could be up to a million dollars depending on what the market commands. So we have to maintain that treatment plan in order to provide potable water through the treatment plan so commodities that goes around with that and All the other materials that we use to provide water. Okay, and then
The third plant the new machine that's a How does it work how does it go on we still
under the state's inspection?
Yes, so in two weeks, we're going to be going through a process called commissioning. And so in the commissioning process, we have to be able to prove to the state regulators that we can operate this properly, that we are producing water that is safe and drinkable for human consumption. and once we finish that commissioning process, this information goes to the state. They review all of the data and in the end, we're hopeful that we're going to get an operating permit so that we...
So how long does it take? Do you foresee how many more months to get it approved and in operation?
I'm hopeful that we're going to have this up in operation in the next three months.
Oh, okay. Yeah, we've been waiting for, what, three years or more?
Yeah, it's been a long time, but you're dealing with a chemical in the groundwater, which a lot of people have not had a lot of experience with, and even the state regulators are very cautious about making sure that we have all of the testing in place, that we've done the testing in a proper fashion before they can sign off on it for human consumption. So it is a public health matter, and so they're being cautious, and rightly so.
Okay. Yeah, hopefully we get approved soon. You know, like you say, three months. Yeah, hopefully.
Hopefully, yes.
Hopefully. Yeah, and I have, well, I can see those wells are doing pretty much a status quo on all the wells. So do we have any big issues coming up on all those wells that we have around the city?
No. I'm not aware of any issues related to the wells. Wells, in general, need to be serviced on a periodic basis. But I'm not aware of any issues that are pending related to the wells. Okay.
Good to know. because before we have some major repairs on some of the wells.
You'll see in the budget that there's the need to rehabilitate some of our water tanks, and so everything needs to be rehabilitated over time.
Yeah. Okay, thank you. You're welcome.
Thank you, Mr. Chan. Mr. Leck? Miss you? Okay, great. I just wanted to add my comment that I'm pleased to see under future goals objectives that improving pedestrian Vehicular safety is among those priorities, you know, especially in light of
We at our last council meeting. We adopted a complete complete streets resolution not to mention You know, we've also been
You know it's been our concern about public safety and so I'm glad that that's part of our future goals.
I'm sorry. Oh, yes. Yes.
Yeah, actually, I have already compared like this year and last year, all public works has actually very long documents that I want to say you did a very good job and everything so reasonable and all the budget, nothing stand out and everything explained by itself so I want to say good job and also one thing I wanted to ask is do we have the street repair schedule yet for the street bonds do or when would that come out that we can see which street will go repair
first first of all the real credit for the budget preparation belongs to Sochi and so I want to thank Sochi for the excellent work that she did in in the
preparation. In terms of the overall schedule of all of the different streets, I'm expecting we've got some minor tweaking that we need to do on our payment management program. And within about a month's time, I'll feel comfortable in having something to release that this is
our schedule for it. We were able to identify our first area, which is in the area bounded by Monterey Park Pass,
Garfield, and the 60 Freeway all the way up to Sequoia Park. So that's the first area that we're focusing on. And our hope is to develop a cycle of between five and seven years so we circulate around the entire city so everybody will see improvements on their streets within that time period.
Okay, thank you.
Thank you for asking that question, Ms. Hugh. I have a follow-up question. If I'm not mistaken, the city's website has in the past had a schedule of its maintenance schedule for repaving. Has that been updated? I don't think it has.
Okay. Do we expect it to be updated anytime soon?
Well, yes.
As I mentioned earlier, in about a month's time, we're tweaking the pavement management program right now.
So when we have the current information, then we will update it.
Okay, because I think for our residents who have come before us concerned about the condition of their streets,
I think that's important to let the community know, especially when we move forward with our program,
but also to have continual updates.
And I think that if we can, please be sure to update our website with these updates to our street maintenance program. Yes, thank you. Thank you. Yes, Mr. Boat.
If I can circle back to there's a question about where the money comes from for the water. You can go to C9. It is the fund balance change of summary. If you go down to 401, 402, and 409, those are specific funds that are used to either maintain the system or actually treat the water. And that is the money that is used to maintain the budget that is requested by the water department. So when you see 401 Water Fund, 402 Water Treatment Water Quality EPA Fund, and 409 Water Differential Fund, these make up the funding mechanisms that actually fund the budget. There are fund balances that we carry over from one year to another year and you can see the fund balances. But this allows you to get a good glance of what the water department is using to fund their budget.
I can see the transfer out on the items that you mentioned.
For the 1, for the 2, for the 9, for the 11, for the 19, no not for 19, for 21.
Yeah, they are all transferred out.
So okay, I got you. Thank you.
Thank you very much, Mr. Bo.
Further questions? Colleagues? All right, hearing none. Thank you very much.
The next department is the non-department.
This doesn't have staff.
These are some of the internal service funds that I was referring to earlier. The general liability post-employment and workers' comp.
Total budget for next fiscal year is $20.3 million.
NON-DEPARTMENT FUNCTION ACCOUNTS FOR COSTS THAT ARE NOT GENERALLY ASSOCIATED WITH A SPECIFIC DEPARTMENT.
THESE PROGRAMS INCLUDE GENERAL LIABILITY, POST-EMPLOYMENT, WORKERS COMPENSATION. THAT'S ALL I HAVE FOR NON-DEPARTMENT. DO YOU HAVE ANY QUESTIONS? MS. YOU?
MS. YOU?
YEAH, WHEN I'M GOING THROUGH ALL THE DOCUMENTS AND AFTER PUBLIC WORKS, I HIT THAT AND I WAS SHOCKED about you know there's two items that post employment that 107 million and also the next box on Q1 the general funds I don't know what happened that suddenly has 102 million dollar funding. So I wanted to know is that? That is an accounting function that we had to do
with the POB so when the so even though we didn't receive the hundred million dollars we had to it went straight to CalPERS we had to record it in our books so we recorded as coming in and we recorded
as going out so that's where you see that hundred that's all related to the pension obligation bonds
I see so reported as general funds coming in it was general funds yes okay well it was recorded
as general funds. Okay, thank you.
Thank you.
Thank you, Ms. Yu. Mr. Chan?
Yeah, I would like to ask the
question that since we have the bond to pay off all the unfunded liabilities,
$160 million I think, around there,
$110 million. So how does it go?
So the bond,
we paid at a point in time, our unfunded liability.
It was paid at a point in time. And the money did not come to us. It went straight from the lending bank straight to CalPERS. And we are now paying the bond. So instead of paying that increase that was going to increase for our normal UAL, we're now paying a flat like seven seven plus million dollars a year for it and
we so it's going well we do have a new UAL but it's very minimal it totals between safety and miscellaneous about 200,000 between the two so it's very minimal right now if there's enough funds in the in the fiscal year when we are closing next fiscal year we'll just I'll just
pay it down again but it's only 200 000 at this point now that 200 000 that you mentioned those are the new hires or no that's just the new ual rr it's just that occurring that you know after we
pay off all those unfunded liabilities and then now because it's the it's uh yeah ongoing correct it's ongoing so it's like uh 200 000 a year yes and if the credit rating drops like i think it's
going to drop from 7 to like a 6.75.
That can also increase our UAL. But at this point, based on our
actual elderly report, it's
only $200,000. I see.
For next fiscal year. But then the interest rate is going to go up?
So how does it affect?
My plan is to pay it as we go. So as long as it's a
small dollar amount like it is for next fiscal year, we should be able to control it.
Oh, so you suggest that to pay off.
Right, and I'm hoping we should have the funding in our budget
for next fiscal year to pay off the $200,000.
Right, because it's not, because like before we accumulate throughout the years, then it becomes a big number that is hard to pay off or just to maintain it.
yeah so it's good to you know address it and
but then we still have that the public tax the .9%
yes we do have that that'll be coming back to council in August but yes we do have that so we can utilize that tax to pay
for enterprise that includes refuse sewer and water and we are proposing 12.9 that's most that's
pretty much all street bonds and then we're proposing uh for community capital improvements
3.1 in detail for enterprise capital our proposal includes uh 887 000 from fund 411
for cured in pipe relining at various locations. We're also proposing 1.3 from fund 411 for spot repairs at various locations.
71,000 from fund 411 for CCTV field equipment upgrade.
387,000 from fund 409, that is DIF funds,
for PLC upgrade.
another $112,000 from DIF funds fund 409 for water main replacement at
the north at Northeast 1.7 million rounded up to 1.8 from fund
401 that's water fund for water main replacement at Northeast and 5 million
from fund 401 for water meter replacements the street projects
include 1.2 from Bonds for the slurry seal, 11.4 from Bonds for street rehabilitation,
200,000 from Measure M for the Sierra Vista stormwater improvements, and 90,000 for Measure,
did I say Measure M? It's Measure W, sorry. 90,000 for Measure W for the catch basin CPS units.
FOR THE COMMUNITY IMPROVEMENT CAPITAL PROJECTS, HALF A MILLION FROM FUND 231, I BELIEVE THAT ALSO DIF FUNDS, TO EXPAND THE LIBRARY.
IT'S 200,000 IN TOTAL, AND IT'S FROM DIF FUNDS, AND IT'S 300,000 FOR THE LIBRARY STORY ROOM, 40,000 for the George Elder Park practice court
another 200,000 to upgrade the Langley bathrooms
and another 230,000 to upgrade the Barnes Gym restrooms that's for a total of 500,000 from DIF funds
we are asking for 1.9 from ARPA funds
to replace various park place ground equipment, including Edison Trails, Sequoia, Garvey Ranch,
Bella Vista, and the Highland playground equipment.
I've added, oh, then we're asking for another $60,000 from ARPA for the $600 from Fund 363,
which is ARPA funds, to purchase a security gate for the second floor city parking.
$127,000 from ARPA funds to purchase a dual modem MDS for the police department. And I added the purchase of vehicles in this one because it's a one-time thing, so I didn't
put into operation.
So even though it's not a capital improvement per se, it is added into the budget in this
area. And we're asking for $525,000 from fund 401, which is water, fund 501, which is shop, and
fund a 238 which is prop A to purchase different city vehicles. That includes for the water
department they need a vehicle, the shop needs a few vehicles and the prop A is for the dial-a-ride
vehicles. And that concludes capital improvements and my presentation. Any questions?
Questions? Mr. Chan?
Yes, on the, I have some concerns on the water meter replacement. I think we replaced it, what, Hans, do you remember? We were, when we were, no, not Siemens, the water meters. It was changed to computerized, right, the smart meters. but it's only like that was beginning of our like 2015, 16, around that so it's only like five seven years seven years or eight years and now we need to replace all those meters again? I'll fill that question. Mr. Bo, enlighten us.
The meters and technology, as you're well aware, technology has gotten better year by year. And as we approach not only conservation but the drought, these meters that we have right now do not give you real-time information for the users. the meters that are out there right now that we are proposing to replace the meters with will give our customers lifetime information at their fingertips and it is the newest technology that's out there it allows us to be better at conservation per account and it allows the users to know when they have a high bill before we actually get flagged so this is a very user friendly type of meter the meters that we put in were initially only to be more efficient in reading meters but the technology that you have now is is really stepping up where it is transparent to the user the user of the meters so that is what the water department is asking to do to start changing out the meters and it is not unusual to be at a five probably a little bit more unusual at five-year mark but not unusual to replace meters at a six year mark six seven years eight years tops deficiency of the meters actually start start going bad especially with electronics regular straight read meters where you did not have electronics you could go to 10 years with no problem
go ahead so on the uh you know it's good to hear that i know that sometimes uh like when i travel and i'm away for a couple weeks my wife and i are away and then you know you would think oh i didn't use any water during that time how come my water bill is and i'm thinking like do i have a leak somewhere so would that app or whatever that be able to help me target that you're correct
that will give you real-time information you can go back in time and actually see where it may have peaked and maybe you have a constant water flap in your toilet that's leaking through or you may have an irrigation leak that you never knew about and we've get we've gotten those complaints from people why do I have to pay this enormous water bill it wasn't my fault how could I see it we We have that on fire lines, we have that on regular domestic lines. And I think these meters will definitely be able to give a more comfort feeling to our users that they can see it for themselves.
And then do you know if the, are they going to have to go on a computer, is there going to be an app? I mean an app would be great if I could look at my phone and just be able to tell.
Yeah, I think you can do both. If you can access your account from a computer then you can get it through your phone.
Okay, thank you. okay so that excuse me this five million dollars is it for all the meters in the city or is it only part of the city or is it commercial and residential alike I
know it's a phased in project I think we're looking at a little bit of a higher dollar figure Tony I think we're looking at a two-phase project if I'm I'm not mistaken. I think it's going to be about $8 million.
$8 million, yeah. It's a two-phase project. We didn't want the sticker shock because we had other priorities in the water department, as you can see. So this is probably just the initial cost, and there's probably anywhere between $3 to $4 million on the second phase.
Just the citywide? Yes, citywide. Including commercial and residential.
I don't know about commercial because commercial is the larger meters, but I do know the residential meters are the ones that are really important for our residents, our customers. I'm not sure, Tony, do you know? Yeah, we're looking at the commercial.
Okay, so it includes commercial too. Oh, that includes.
And then we do have a lot of condos. Well, apartment is okay because it's mostly paid for by the landlord. but the condos, we have, before we have arguments that I have only two persons in my household and my next door has like six people, you know, a bigger family, and they have one common meter coming from the street. And then there was the argument is that you use a lot more water than I do. And then I raised the question at that time, and then all those condo units, if they want to install an individual or submeter inside, there's not a small amount of money to install that submeter inside the condos. So does this $5 million replacement, does it address those issues as well, those condo issues?
It will not, because what you're talking about is on private property to install a sub-meter. And cities do not install sub-meters. Cities install meters in public right-of-way in the property that we own. So we're replacing the meters that we own in the public right-of-way.
I see. So those will stay the same. Yeah, the condos, they will still...
You're correct.
Right.
If they have an existing two-inch meter, we will replace that meter with a two-inch meter.
Right. So, okay. So those are the private situation that the city cannot really do anything about it,
unless the property owner or the condo owners that they want to put in the money and do the submeters.
As we say in our executive management team, it's an internal management issue that they have to deal with.
Okay.
Okay, and then, yeah, I think all those capital improvements, we did it. I just want to raise the question on that meter because kind of like, okay, that you say is like around five, six years. So I think it is about that time. But can we get some grants from a water district or some other places?
We're actually looking at that, and I don't want to promise anything, but it looks favorable.
Oh, okay. From our water district?
Yes. Okay. Good.
Thank you. Thank you, Mr. Chan. Any other comments, questions? I have a question.
Regarding the $1.9 million from ARPA fund for the equipment replacement that Edison Trails,
Sequoia, Garvey Ranch, Bella Vista, and Highland.
And so when you say replace, are we talking about like playground equipment or whatever existing equipment is at these locations?
I believe it is playground equipment, but Robert, are you correct?
You're correct. It is the playground equipment. And I'm just curious, is it just simply replacing what is existing or, for example, like other opportunities to even expand?
And what I'm getting at is that I've noticed in neighboring communities, there are, like, stationary equipment.
And just a thought, I mean, again, the way it's worded, it says replace place ground equipment, but I'm just curious, are we also looking at also enhancing that equipment as well?
It would be replacing and enhancing. So, yes, it would be getting rid of the current equipment that's there, most of which is 20-plus years old,
and it would be replacing with new enhanced not only play equipment but also safety surfacing as well. Okay. Yeah. Okay.
And are we also looking at possibly, like, as I said, I've noticed in some neighboring communities,
I think it's very ingenious, they have, like, basically exercise equipment,
but it's actually stationary equipment that people can use to do like exercise. Yeah, that's absolutely something we can look at including in some of those projects.
Okay.
That's kind of like what we have currently with the fitness court at Barnes Park.
Yes, which is very elaborate. We could do something like that at a smaller scale at some of those parks as well.
For example, if you go down what is Monterey Path Road and it becomes Mednick in East LA,
I want to say Belvedere Park. There is, it's a couple of years old now,
but essentially it would,
I would describe it as like a step ladder or like stationary knowledge machine.
It's like a stationary stepping machine that utilizes your body weight. Yeah. So we can do something like that.
One of the projects I looked at is Edison Trails
where we could replace the playground equipment.
Thank you to the entire staff, department heads, and everyone here for presenting to council tonight, as well as those in the audience, I know, who was here earlier to listen, and to, of course, colleagues for your very insightful and probing questions.
Any follow-up comments, questions?
Okay, well, hearing none, let's see.
Do we need to continue to May 31st, or are we good?
Council, if you are completely finished with your comments and additions, deletions, or
we've taken some copious notes, we will present the budget in an entire for adoption at the
second meeting in June.
Okay, great. Wonderful. Thank you.
Well, then if that is it, then I have no further business. and I can
I am one happy to conclude today's
meeting at 10.17pm
thank you very much and have a good evening have a good evening and
good night
Counciloris